My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Bristol Street Widening: Phase IV - Warner to <br />St. Andrew <br />PROJECT CATEGORY: <br />ARTERIAL IMPROVEMENTS - <br />ARTERIAL WIDENING <br />LOCATION MAP <br />I Ll L <br />L <br />L <br />R E' <br />olf� <br />03 <br />ml�i <br />WARNER AV {DELH <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The environmental documents for the Bristol Corridor <br />were approved in 1990 and this project segment is <br />currently in the final design phase. The total project <br />cost is estimated at $17,219,000 for design, right of <br />way and construction phases. <br />PROJECT COSTS <br />Engineering <br />FY 13/14 FY 14/15 <br />737,946 <br />TOTAL 737,946 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 <br />FED DEMO (PYj 737,946 <br />TOTAL 737,946 <br />PY = Funds awarded in Multiple Prior Fiscal Years <br />PROJECT NEED: <br />Bristol Street from Warner Avenue to St Andrew <br />Place (Phase IV) is part of the City's plan to widen <br />Bristol Street from Warner Avenue to Memory Lane, <br />which was approved by City Council in 1990. Existing <br />roadway has only 2 lanes in each direction and is <br />operating at a LOS F. This widening is needed to <br />improve traffic flow and increase capacity. Widening <br />has already been completed for 2 segments along <br />Bristol Street: St. Andrew PI to Third St and Elm St to <br />Memory Ln. <br />FY 15/16 FY 16/17 FY 17/18 FY 13/19 FY 19/20 <br />FY 15/16 FY 16/17 FY 17/16 FY 16/19 FY 19/20 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 14- May -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.