Laserfiche WebLink
PROJECT TITLE: <br />Grand Avenue Widening: First to Fourth <br />PROJECT CATEGORY: <br />ARTERIAL IMPROVEMENTS - <br />ARTERIAL WIDENING <br />LOCATION MAP <br />uL <br />o <br />=� W <br />n 3RD S <br />ND ST <br />�uWALN ST � <br />�2 <br />1 ° <br />J <br />CHESTNOTAV <br />F <br />r <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Grand Avenue between First <br />Street and Fourth Street from 2 to 3 lanes in each <br />direction. The project also includes an additional left <br />turn lane at First Street, bus turn outs at First Street <br />and Fourth Street, a raised median, and bike lanes. <br />The total project cost is estimated at $17,054,000 for <br />design, right of way and construction phases. <br />PROJECT COSTS <br />Land Acquisition <br />FY 13/14 FY 14/15 <br />2,790,262 <br />TOTAL 2,790,262 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 <br />Area Fees (PYt 2,790,262 <br />TOTAL 2,790,262 <br />PY = Funds awarded in Multiple Prior Fiscal Years <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) <br />Strategic Plan Technical Report identified the need <br />for Grand Avenue to be widened to a six -lane major <br />arterial to meet MPAH requirements. The existing <br />Average Daily Traffic (AD7) is in excess of 35,000 <br />vehicles per day. The proposed improvements will <br />allow the segment to accommodate future traffic <br />volumes at a Level of Service 8 or better and <br />increase operational efficiency. <br />FY 15/16 FY 16/17 FY 17/16 FY 13/19 FY 19/20 <br />FY 15/16 FY 16/17 FY 17/16 FY 13/19 FY 19/20 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 14- May -13 <br />