Laserfiche WebLink
PROJECT TITLE: <br />Chestnut Avenue Rehabilitation: Broadway to <br />Main <br />PROJECT CATEGORY: <br />ARTERIAL IMPROVEMENTS - <br />STREET RECONSTRUCTION /RESURFACING <br />LOCATION MAP <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction /resurfacing of existing pavement and <br />replacementfinstallation of missing or damaged, <br />curbs, gutters, sidewalks, driveway approaches, and <br />wheelchair ramps along Chestnut Avenue between <br />Broadway and Main Street. <br />PROJECT COSTS <br />Engineering <br />Construction <br />TOTAL <br />PROJECT NEED: <br />The segment of Chestnut Avenue from Broadway to <br />Main Street has been identified as a high priority by <br />the City's Pavement Management System. The <br />pavement is deteriorating due to weather, age, and <br />heavy usage. Some of the adjacent curbs, gutters, <br />driveway approaches, curb ramps, and sidewalks are <br />also in various states of disrepair and require <br />replacement. <br />FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />22,000 <br />265,000 <br />287,000 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />Gas Tax 287,000 <br />TOTAL 287,000 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 01- Apr -13 <br />-15- <br />