Laserfiche WebLink
PROJECT TITLE: <br />Civic Center Drive Rehabilitation: Main to <br />Spurgeon <br />PROJECT CATEGORY: <br />ARTERIAL IMPROVEMENTS - <br />STREET RECONSTRUCTION /RESURFACING <br />LOCATION MAP <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction /resurfacing of existing pavement and <br />replacementfinstallation of missing or damaged, <br />curbs, gutters, sidewalks, driveway approaches, and <br />wheelchair ramps along Civic Center Drive between <br />Main Street and Spurgeon Street. <br />PROJECT COSTS <br />Engineering <br />Construction <br />TOTAL <br />PROJECT NEED: <br />The segment of Civic Center Drive from Main Street <br />to Spurgeon Street has been identified as a high <br />priority by the City's Pavement Management System. <br />The pavement is deteriorating due to weather, age, <br />and heavy usage. Some of the adjacent curbs, <br />gutters, driveway approaches, curb ramps, and <br />sidewalks are also in various states of disrepair and <br />require replacement. <br />FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />33,000 <br />407,000 <br />440,000 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />Gas Tax 440,000 <br />TOTAL 440,000 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 04- Apr -13 <br />-16- <br />