My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Memory Lane Rehabilitation: Main to North <br />City Limit <br />PROJECT CATEGORY: <br />ARTERIAL IMPROVEMENTS - <br />STREET RECONSTRUCTION /RESURFACING <br />LOCATION MAP <br />MAIN ST <br />I � <br />Ii <br />d � <br />a <br />n► <br />3 <br />LAW= rT uwav+ YT <br />Z <br />9ANfla3o Ar <br />$, 8T <br />JyJ -J D PARKER y <br />Q <br />OMOOYT <br />� aZ <br />FAIRMMT Ay .. <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction /resurfacing of existing pavement and <br />replacementfinstallation of missing or damaged, <br />curbs, gutters, sidewalks, driveway approaches, and <br />wheelchair ramps along Memory Lane between Main <br />Street to North City Limit. <br />PROJECT COSTS <br />Engineering <br />Construction <br />TOTAL <br />PROJECT NEED: <br />The segment of Memory Lane from Main Street to <br />North City Limit has been identified as a high priority <br />by the City's Pavement Management System. The <br />pavement is deteriorating due to weather, age, and <br />heavy usage. Some of the adjacent curbs, gutters, <br />driveway approaches, curb ramps, and sidewalks are <br />also in various states of disrepair and require <br />replacement. <br />FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />62,000 <br />767,000 <br />829,000 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />Gas Tax 829,000 <br />TOTAL 829,000 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 28- Mar -13 <br />-18- <br />
The URL can be used to link to this page
Your browser does not support the video tag.