My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />McFadden Avenue Rehabilitation: Newhope to <br />Harbor <br />PROJECT CATEGORY: <br />ARTERIAL IMPROVEMENTS - <br />STREET RECONSTRUCTION /RESURFACING <br />LOCATION MAP <br />11 <br />9 <br />n <br />n <br />v <br />v <br />M <br />z <br />a <br />C <br />M <br />z <br />C <br />M <br />BLVD <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction /resurfacing of existing pavement and <br />replacementfinstallation of missing or damaged curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps along McFadden Avenue between <br />Newhope Street and Harbor Boulevard. <br />PROJECT COSTS <br />Engineering <br />Construction <br />TOTAL <br />PROJECT NEED: <br />The segment of McFadden Avenue from Newhope <br />Street to Harbor Boulevard has been identified as a <br />high priority by the City's Pavement Management <br />System. The pavement is deteriorating due to <br />weather, age, and heavy usage. Some of the <br />adjacent curbs, gutters, driveway approaches, curb <br />ramps, and sidewalks are also in various states of <br />disrepair and require replacement. <br />FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 16/19 FY 19/20 <br />48,000 <br />598,000 <br />646,000 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/16 FY 16/19 FY 19/20 <br />Gas Tax 646,000 <br />TOTAL 646,000 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 26- Mar -13 <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.