Laserfiche WebLink
PROJECT TITLE: <br />Portola Parking Lot, Basketball Court and <br />Tennis Court Renovation <br />PROJECT CATEGORY: <br />BIKEWAY /PARK IMPROVEMENTS - <br />PARK IMPROVEMENTS /RENOVATION <br />LOCATION MAP <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Renovation of the existing parking lot, basketball <br />court and tennis court at Portola Park. Project will <br />include removal and resurfacing of the asphalt <br />parking lot and basketball court. The tennis court will <br />be recaulked, resurfaced and re- striped. <br />PROJECT COSTS <br />Engineering <br />Construction <br />TOTAL <br />PROJECT NEED: <br />The existing parking lot and basketball court is <br />deteriorating, cracking and shows signs of root <br />problems and loose gravel. The tennis court surface <br />shows signs of cracks, open joint areas and surface <br />problems. All three areas need renovation to improve <br />the usefulness and to eliminate safety concerns. <br />FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />29,000 <br />257,500 <br />286,500 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />Capital Outlay 286,500 <br />TOTAL 286,500 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Parks, Rec. & Community Services Administration Ron Ono, Admin Svcs Mgr 04- Apr -13 <br />-46- <br />