My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - MEDIAN LANDSCAPE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
25E - AGMT - MEDIAN LANDSCAPE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 5:47:10 PM
Creation date
6/13/2013 2:55:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/17/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The Contractor shall complete the schedule for each site in a manner <br />which shall correspond to the weekly schedules. <br />K. <br />• The annual schedule shall be submitted for City approval within fifteen <br />(15) calendar days after effective date of the contract. <br />The Contractor shall submit revised schedules when actual <br />performance differs substantially from planned performance. <br />Weekly Schedule <br />• Weekly schedule forms shall be provided by the Contractor indicating <br />the major items of work to be performed in accordance with the <br />performance requirements and further delineate the accomplishment <br />by day of the week. <br />• The Contractor shall complete the schedule for each item of work and <br />each area of work. <br />• Changes to the schedule shall be received by the Projects Manager <br />or designee at least twenty-four (24) hours prior to the scheduled time <br />for the work. <br />• Failure to notify of a change and/or failure to perform an item of work <br />on a scheduled day may result in deduction of payment for that date, <br />week, or month. <br />• The Contractor shall adjust his/her schedule to compensate for all <br />holidays and rainy days. Maintenance and litter removal shall be <br />scheduled for all holidays and rainy days, unless otherwise indicated <br />by the City. <br />Daily Schedule <br />• Daily completed performance sheet shall be emailed or delivered to <br />the Projects Manager or designee before 4:00 p.m. each work day. <br />• It shall list site locations and completion of each and notes for Projects <br />Manager or designee. <br />Changes to daily schedule can be made verbally or by email to the <br />Projects Manager or designee. <br />PERFORMANCE ON SCHEDULE <br />The Contractor has been provided the maximum latitude in establishing <br />work schedules which correspond to its manpower and equipment <br />resources. The Contractor has also been provided the opportunity and <br />procedure for adjusting those schedules to meet special circumstances. <br />25E-20
The URL can be used to link to this page
Your browser does not support the video tag.