My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-06-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
FULL PACKET_2013-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:24:04 PM
Creation date
6/17/2013 1:06:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. PRE- PROPOSAL CONFERENCE AND JOB WALK <br />There will be a pre - proposal conference and job walk. A detailed map and a work <br />location are provided in EXHIBIT of this Request for Proposal. Staff will be <br />available to meet or visit any of the sites during the week of , Monday <br />through Thursday, between the hours of 8:00 -11:00 a.m. Questions regarding job <br />locations and work sites listed in this contract can be submitted to Jerry Jeffries at (714) <br />647 -5015 or via e -mail to jjeffries @santa- ana.org. Contractors will be responsible for <br />visiting the sites and reviewing all areas of work before submitting proposals. <br />16. PRE- QUALIFICATION PROCESS <br />In addition to submitting all documentation required in this RFP specification, bidders <br />may also be required to demonstrate their ability to successfully perform the type of <br />maintenance work contemplated by this RFP specification, including but not limited to <br />providing an adequate number of staff, suitable equipment and materials as determined <br />by the Director. <br />17. SURETY BONDS <br />Each bid must be accompanied by a bid bond or a cashier's or certified check payable to <br />the City of Santa Ana, in an amount not less than ten percent (10 %) of the aggregate of <br />the bid, as a guarantee that the bidder will enter into the proposed contract if the same is <br />awarded to him. The successful bidder will also be required to submit to the City a <br />payment bond for not less than ten percent (10 %) of the contract price. <br />18. REVIEW OF JOB SITE <br />The Contractor shall be held responsible for carefully reviewing the site and verifying all <br />areas of work, prior to bid submittal. <br />III. EVALUATION OF PROPOSALS <br />The response to this Request for Proposal should contain documentation of Contractor's <br />credentials and expertise in this field. Substantial consideration will be given to contractors with <br />demonstrable and documented experience in similar work. Responses will be evaluated on the <br />basis of the qualifications, abilities, and responsiveness of the proposing contractors. <br />An evaluation committee appointed by the Executive Director of the Public Works Agency will <br />review the responses received. All proposals received will be fully reviewed and rated by the <br />evaluation committee. The successful proposal will be based upon both technical merit and cost <br />competitiveness. The committee will evaluate all proposals based on the following criteria: <br />Capability and Experience of Contractor <br />50% <br />Ability of contractor to obtain the staff and equipment necessary to perform <br />specifications. <br />Training and safety precautions taken to perform specifications. <br />Contractor's financial ability to provide uninterrupted technical services throughout the <br />term of the agreement. <br />5 <br />19C -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.