My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T & B PLANNING 5 - 2013
Clerk
>
Contracts / Agreements
>
T
>
T & B PLANNING 5 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2015 9:50:25 AM
Creation date
6/17/2013 4:03:19 PM
Metadata
Fields
Template:
Contracts
Company Name
T & B PLANNING
Contract #
N-2013-068
Agency
PUBLIC WORKS
Expiration Date
6/30/2014
Insurance Exp Date
2/1/2015
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CEQA Consulting Services — Walnut Pump Station Building <br />EXHIBIT A: SCOPE OF WORK <br />.f� <br />vi.n xrvinc <br />document. The substance of the MND will be the Initial Study, accompanied by additional documentation that <br />includes a detailed description of the proposed project and discusses: 1) the requirements of CEQA; 2) the <br />primary purpose of a MND; 3) the standards for adequacy for a MIND pursuant to the State CEQA Guidelines; 4) <br />the format and, content of the MND; and 5) the City's processing requirements to consider the proposed project <br />and MND for approval. T &B Planning will submit the draft MIND to the City for review and approval. The budget <br />for this task assumes a single round of revisions to the MIND to incorporate a modest to minor set of comments <br />from the City and /or its legal counsel. The need for extensive revisions is not anticipated or budgeted for in this <br />proposal. <br />Upon receiving the City's authorization to finalize the Initial Study and MND (IS /MND), T &B Planning will prepare <br />and print one (1) "photo ready' set of originals of the Initial Study and MND one (1) CD of the MND and any <br />associated technical reports. For purposes of this proposal, it is assumed that the City of Santa Ana will be <br />responsible for producing all hard copies and /or CDs of the IS /MND document that will be distributed for public <br />review. <br />TASK 6: CIRCULATE INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION <br />T &B Planning will prepare the Notice of Intent (NOI) to Adopt a MIND and the Notice of Completion (NOC) <br />required for the Initial Study and MND's 30 -day public review period. Pursuant to CEQA requirements, the NOI <br />will include a brief description of the project and its location; starting and ending dates of the public review <br />period; date, time, and place of public meetings or hearings to consider the project (if known at the time of <br />notice); address where copies of the IS /MND are available for review; and disclosure if the project site is on any <br />lists enumerated under Section 65962.5 of the Government Code (hazardous waste sites). The NOC form will be <br />obtained from the State Clearinghouse website. One (1) electronic copy each of the NOI and NOC will be <br />provided to the City. <br />T &B Planning will work with City staff to ensure that the NOI, NOC, and IS /MND are properly distributed for <br />public review and meet CEQA distribution procedural requirements. For this project, noticing will need to occur <br />as follows: <br />• The NOI will be mailed to responsible agencies, trustee agencies, and the Orange County Clerk, as <br />well as all organizations and individuals who previously requested notice (CEQA Guidelines Section <br />15072(a) & (b)); and <br />• The NOI will be publically advertised in at least one of the following ways: 1) publication in a <br />newspaper of general circulation in the area affected by the project; 2) posting of notice on and off - <br />site in an area where the project is to be located; and /or 3) direct mailing to owners and occupants <br />of contiguous property shown on the latest equalized assessment roll (CEQA Guidelines 15072(b)1- <br />3). <br />This proposal assumes that the City will compile the distribution list and provide mailing labels for the <br />Walnut Pump Station April 26, 2013 <br />T &B Planning, Inc. <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.