Laserfiche WebLink
RESOLUTION 2013-031 <br />REVENUEFY 13-14 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />Projects prior to May 18, 2009, shall be subject to the fees indicated in Resolution 2009-018 <br />$83.47 <br />5160322) Inspections for which no fee is specifically Per Hour <br /> indicated (minimum charge - one (1) hour) <br />$83.47 <br />5360123) Additional plan review required by changes, additions, orPer Hour <br /> revisions to approved plans (minimum charge - one (1) hour) <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />MECHANICAL CODE <br />51604 <br />$39.91 <br />Any person desiring a permit required by the MechanicalEach Permit <br />Code shall, at the time of filing an application, pay a fee <br />of $39.91. There is no minimum fee for the issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be$65.21.$65.21 <br />FEE SCHEDULE <br />$29.12 <br />516041) For the installation or relocation of each forced-air or Each <br /> gravity-type furnace or burner, including ducts and <br /> vents attached to such appliance, up to and including <br /> 100,000 BTU/h <br />$41.58 <br />516042) For the installation or relocation of each forced-air Each <br /> or gravity-type furnace or burner, including ducts <br /> and vents attached to such appliance over 100,000 BTU/h <br />$50.29 <br />516043) For the installation or relocation of each boiler, compressor,Each <br /> condensing unit or heat pump up to and including five <br /> horsepower, or each absorption system to and including <br /> 100,000 BTU/h <br />64 <br /> <br />