My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-031 - Establishing A Uniform Schedule of Miscellaneous Fees for FY 2013-2014
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2013
>
2013-031 - Establishing A Uniform Schedule of Miscellaneous Fees for FY 2013-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 4:29:24 PM
Creation date
6/26/2013 12:06:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2013-031
Date
6/17/2013
Destruction Year
P
Document Relationships
2012-022 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2012-031
(Repeals)
Path:
\Resolutions\CITY COUNCIL\2011 -\2012
2014-046 - Establishing a Uniform Schedule of Miscellaneous Fees For FY 2014-2015
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2013-031 <br />REVENUEFY 13-14 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />Projects prior to May 18, 2009, shall be subject to the fees indicated in Resolution 2009-018 <br />$50.29 <br />516044) For the installation or relocation of each boiler, Each <br /> compressor, condensing unit or heat pump over five <br /> horsepower up to and including 30 horsepower or <br /> for each absorption system over 100,000 BTU/h up <br /> to and including 1,000,000 BTU/h <br />$61.04 <br />516045) For the installation, relocation of each boiler, compressor, Each <br /> condensing unit or heat pump over 29 horsepower up to and <br /> including 50 horsepower or for each absorption system over <br /> 1,000,000 BTU/h up to and including 1,750,000 BTU/h <br />$83.47 <br />516046) For the installation or relocation of each boiler, compressor,Each <br /> condensing unit or heat pump over 49 horsepower, or each <br /> absorption system over 1,750,000 BTU/h <br />$19.77 <br />516047) For each VAV control box or air handling Each <br /> unit to and including 2,000 cubic feet per minute, <br /> including ducts attached thereto <br />$29.12 <br />516048) For each VAV or air-handling unit over 2,000 cfmEach <br /> Note: <br /> This fee shall not apply to an air-handling <br /> unit which is a portion of a factory assembled <br /> appliance, cooling unit, evaporative cooler or <br /> absorption unit for which a permit is required else <br /> where in this code. <br />$50.29 <br />516049) Outdoor dual packaged heating and cooling Each <br />$29.12 <br />5160410) For the installation or relocation of each floor Each <br /> furnace, including vent <br />$29.12 <br />5160411) For the installation or relocation of each suspended Each <br /> heater, recessed wall heater or floor-mounted unit heater <br />$29.12 <br />5160412) Decorative fireplaceEach <br />65 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.