My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLEMING ENVIRONMENTAL, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
FLEMING ENVIRONMENTAL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:01:31 PM
Creation date
7/1/2013 2:21:11 PM
Metadata
Fields
Template:
Contracts
Company Name
Fleming Environmental, Inc.
Contract #
13-6793
Agency
Public Works
Council Approval Date
6/17/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award for Maple Street Bike Trail Storm Drain CDS Project <br />June 17, 2013 <br />Page 2 <br />A Notice Inviting Bids was advertised on May 5 & 7, 2013, and bids were opened on May 22, <br />2013. The following is a summary of the bid invitations mailed and received, and the bid results: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />12 <br />Contractors requesting bidding documents <br />12 <br />Bids received <br />8 <br />Bids received from Santa Ana contractors <br />0 <br />Bid Results Summary <br />RANK <br />BIDDERS NAME <br />LOCATION <br />BASE BID <br />1 <br />Fleming Environmental, Inc. <br />Fullerton <br />$153,940.00 <br />2 <br />Excel Paving Company <br />Long Beach <br />$154,961.00 <br />3 <br />GRFCO, Inc. <br />Moreno Valley <br />$155,900.00 <br />4 <br />Paulus Engineering, Inc. <br />Anaheim <br />$161,469.98 <br />5 <br />GCI Construction, Inc. <br />Costa Mesa <br />$213,080.00 <br />6 <br />Bali Construction, Inc. <br />S. El Monte <br />$216,720.00 <br />7 <br />Atlas- Allied, Inc. <br />Anaheim <br />$224,000.00 <br />8 <br />John T. Malloy, Inc. <br />Los Angeles <br />$255,760.00 <br />A total of eight bids were received and deemed responsive, with Fleming Environmental, Inc., <br />submitting the lowest responsive bid. Their $153,940 bid is 71 percent over the $90,000 <br />Engineer's Estimate. The Engineer's Estimate, however, did not include the cost of structural <br />design and installation of heavy duty shoring that is required and necessary to work at a depth <br />of up to 21 feet. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended action is exempt <br />from further review. Categorical Exemptions Environmental Review No. 2013 -45 (Project <br />136793) was filed for this project. In addition, a Certification of Categorical Exemption and a <br />Statutory Worksheet have been prepared in accordance with the National Environmental Policy <br />Act. <br />
The URL can be used to link to this page
Your browser does not support the video tag.