My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VASILJ, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
VASILJ, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:14:09 PM
Creation date
7/2/2013 7:27:51 AM
Metadata
Fields
Template:
Contracts
Company Name
VASILJ, INC.
Contract #
12-6605
Agency
Public Works
Council Approval Date
6/17/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FO� <br />TO: <br />Rudy Rosas, P.E., City of Santa Ana <br />FROM: <br />Mark Bush, P.E., Tetra Tech <br />JOB TITLE: <br />Westminster Avenue Sewer Improvement Project <br />PROJECT NO: <br />134- P00597- 0086.04 (300) <br />SUBJECT: <br />Estimated Schedule for Construction <br />DATE: <br />February 19, 2013 <br />WIAM%Mfl� 011 <br />The Estimated Schedule for Construction is based on Tetra Tech's experience with similar projects of <br />nature, size, and knowledge of the City's existing system. <br />The following permits are to be obtained by the Contractor prior to construction: <br />City of Santa Ana Encroachment Permit <br />City of Garden Grove Engineering Permit <br />In order to obtain these permits, the Contractor is responsible to prepare traffic control plans and submit <br />to the agencies listed above and obtain approval. Traffic control plans shall be submitted to the City for <br />approval no later than four (4) weeks after the award of the contract. <br />The Contractor's activities shall be confined to the following hours: <br />I. From 9:00 a.m. to 3:00 p.m., Monday through Friday, except as otherwise noted. <br />2. Construction activities within the intersection of Harbor Boulevard and Westminster Avenue shall <br />be performed from 9 p.m. to 5 a.m., Monday through Friday. <br />3. All direct tap lateral connections to the existing sewer laterals, including installation of cloan -outs, <br />shall be performed from 9 p.m. to 5 a.m., Monday through Friday. <br />4. The work at the intersection of Clinton that requires the upstream manhole (South Clinton) to be <br />plugged in order to install the new 8 -inch sewer pipe shall be performed from 9 p.m. to 5 a.m., <br />Monday through Friday. <br />The aforementioned hours impact when the work can be performed and the Contractor's production <br />rates. <br />The Contractor will also be responsible to obtain the following permits, but these are not believed to be <br />critical path items: <br />Business Liceme, Each Prime Contractor and Subcontractor shall obtain and pay for a Santa Ana <br />Business License and a City of Garden Grove Business License. Detailed information concerning <br />business license may be obtained from the Finance and Management Services Agency, <br />(714) 647 -5447, City Hall. <br />P; \P00597 \0086\WordPro \04 \Corn pondeneelrno02- 2013- 02- 19- mv.doc(300) <br />
The URL can be used to link to this page
Your browser does not support the video tag.