My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VASILJ, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
VASILJ, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:14:09 PM
Creation date
7/2/2013 7:27:51 AM
Metadata
Fields
Template:
Contracts
Company Name
VASILJ, INC.
Contract #
12-6605
Agency
Public Works
Council Approval Date
6/17/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 19, 2013 <br />Page 2 <br />2. Construction Water Permit. Each Prime Contractor or Subcontractor which desires to obtain water <br />from AGENCY -owned fire hydrants for construction or any other purpose shall first obtain and pay <br />for a permit from the Corporate Yard of the City of Santa Ana at 220 South Daisy Avenue. <br />Information concerning costs and conditions may be obtained from the AGENCY by calling <br />(714) 647 -3320. Use of private water from a hose bib Is not allowed. <br />3. Disposal Permit. In accordance with the procedures of the Orange County General Services <br />Administration (GSA), the cost for the disposal of all materials at County landfill sites shall be <br />home by the Contractor. <br />4. OSHA Excavation Permit. Contractor shall obtain an OSHA excavation permit, including an <br />inquiry number from "Underground Service Alerr'. <br />Summarized herein is suggested phasing for construction activities: <br />1. Submit shop drawings and obtain permits; <br />2. Phase I: Construct 15 -inch and 8 -inch sewer main and manholes from connection at Harbor <br />Boulevard to Roxey Drive and test main and manholes. Do not divert flow into new main. Construct <br />new manholes over existing 8 -inch laterals and maintain lateral through manhole. Construct service <br />laterals partially across the street to the limits of the traffic control. Install inflatable plugs and <br />temporary caps in service laterals at Sta. 924-20, Sta. 93 +67, Sta. 94 +32, and Sta. 95 +68. <br />1 Phase II: Starting from Harbor Boulevard and working east to Sta. 88 +50, continue constructing <br />service laterals and clean-outs and connect new service lateral to existing service lateral. Break and <br />remove the existing laterals constructed through manholes, divert flow into new 15 -inch sewer <br />main, and construct a brick and mortar plug in the outlet no longer being used. <br />4, Phase IIF. Break and remove the existing lateral constructed through new manhole Sta. 89 +26.3 <br />(Sta. 9 +86.5 Clinton) and divert flow into new 15 -inch sewer main, Maintain flow from South <br />Clinton into existing 12 -inch sewer. Construct new 8 -inch sewer to the south within limits of the <br />traffic control. <br />S. Phase IV: Break and remove the existing lateral constructed through manhole Sta. 92 +78.4, divert <br />flow into new 15 -inch sewer main, and construct a brick and mortar plug in the outlet no longer <br />being used. Break and remove the existing lateral constructed through manhole Sta. 96 +18.5 <br />(Stu. 9 +86.5 Roxey) and divert flow into new 15 -inch sewer main, and construct a brick and mortar <br />plug in the outlet no longer being used. Re- channel the manhole base at existing manhole <br />Sta. 96 +18.5 and divert upstream flow at Roxey Drive into new 15 -inch sewer, and construct a brick <br />and mortar plug in the outlet no longer being used. <br />6. Phase V: Working east to west from Ste. 96 +18.5, construct laterals and clean -nuts and connect <br />new service laterals to existing service laterals at Sta. 92 +20, Sta. 93.1.67, Sta. 94 +32, and <br />Sta. 95 +68 (Typo B laterals) and connect now service laterals to existing service laterals. <br />7. Phase VI: After all flows upstream of existing manhole at Sta. 9+71.8 (Clinton) have been <br />transferred to the new 15 -inch sewer, make final connection of 8 -inch sewer picking up flows from <br />South Clinton. Temporarily plug upstream manhole on 8 -inch sewer, remove manhole, and make <br />final connection. <br />P; \P00597\ 0086 \WordPm \04\Corre pondence\mo02- 2013 -02- 19- rev.doc(300) <br />
The URL can be used to link to this page
Your browser does not support the video tag.