My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - TRAFFIC SIGNAL EQUIPMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
23A - PROJ - TRAFFIC SIGNAL EQUIPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 1:42:59 PM
Creation date
7/11/2013 11:46:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
7/15/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award to Aegis ITS, Inc., for Traffic Signal Equipment <br />Replacement Phase I (Project No. 10-6719) <br />July 15, 2013 <br />Page 2 <br />NAME OF BIDDER CITY <br />1. Aegis ITS, Inc. Anaheim <br />2. California Professional Engineering, Inc. La Puente <br />3. Pelagic Engineering. Oxnard <br />4. P.T.M. General Engineering Services, Inc. Riverside <br />5. Select Electric, Inc. Poway <br />BID AMOUNT <br />$126,371.67 <br />$148,750.00 <br />$165,620.00 <br />$173,950.00 <br />$192,550.00 <br />A total of five bids were received and all were responsive to the specifications. The lowest bid was <br />submitted by Aegis ITS, Inc., in the amount of $126,372.67, which is below the engineer's estimate <br />of $132,500. Based on the low bid and the corresponding unit prices, the estimated quantities for <br />this project may be adjusted in response to needed pedestrian improvements; however, the <br />contract is nonetheless limited to $150,000. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the proposed project is exempt from <br />further review. Categorical Exemption ER No. 2010-14 will be filed for this project. <br />FISCAL IMPACT <br />The Cost Analysis shows a total estimated project delivery cost of $160,000 (Exhibit 1). Funds are <br />available in the Measure M2 Turnback Fund (Account 03217662-66220). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />Raul Godinez II, P.E. Francisco Gutierrez <br />Executive Director Executive Director <br />Public Works Agency Finance & Management Services Agency <br />RG/vn <br />Exhibit: 1. Cost Analysis <br />23A-2
The URL can be used to link to this page
Your browser does not support the video tag.