My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
25A - AGMT - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 1:47:11 PM
Creation date
7/11/2013 1:35:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25A
Date
7/15/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.4.3 Diamond or Beckson Pump: Used to remove standing water in <br />brickdust areas. Shall be plastic with flexible piston and value. <br />5.4.4 Infield Sopper with Wringer and Bucket: Used to collect standing <br />water in brickdust areas. Sopper shall be geotextile-covered <br />sponge typical for absorbing chemical spills. <br />6.0 Meetings <br />6.1 Contractor shall provide City of Santa Ana staff with a contact person and a <br />phone number to reach the contact person from the hours of 6:30am - 5:00pm, <br />Monday - Saturday. <br />6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site <br />supervisor". This site supervisor shall meet with staff as requested at time and <br />place agreed upon by both parties for as long as the contract is in effect to discuss <br />any problems/concerns that may arise and any goals for the week. <br />6.3 In November of each year for as long as the contract is in effect, Contractor shall <br />personally meet with staff, along with the designated site supervisor, to discuss <br />and outline schedules for "Annual Renovations" (listed in Section 10.0). <br />7.0 Daily Infield Maintenance <br />7.1 General <br />7.1.1 Contractor shall remove all litter, broken glass and hazardous <br />debris from infield and dugout areas. <br />7.1.2 Contractor shall keep brickdust and dugout areas in a weed free <br />condition. <br />7.1.3 Contractor shall hose and/or sweep and hose out all dugouts so <br />they are 100% free of brickdust or any other debris. <br />7.2 Maintenance Procedure <br />7.2.1 Retain smooth and level playing surface, using the following daily <br />procedure. The contractor shall remove all bases before beginning <br />any work on in-field and re-install after all work on in-field is <br />completed. <br />7.2.2 After removing all bases, the contractor shall scrape/wire brush all <br />base post anchors and base inserts. This will help facilitate the <br />base removal and installation. <br />25A-40
The URL can be used to link to this page
Your browser does not support the video tag.