My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
25A - AGMT - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 1:47:11 PM
Creation date
7/11/2013 1:35:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25A
Date
7/15/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2.3 The Contractor shall rake/shovel loose material from high spots <br />back into low spots/worn areas on running paths, sliding zones, <br />and any other low spots/worn areas appearing on the field before <br />any watering or dragging shall take place <br />7.3 Home Plate Area/Batters Box Area Holes <br />7.3.1 Sweep/Rake away all loose brickdust. <br />7.3.2 Wet area until moist. <br />7.3.3 Scarify area (`s) [batters box hole(`s)] with shovel. This will help <br />the mix bind better. <br />7.3.4 In a 5 gallon bucket mix "mound mix" with water to desired <br />consistency. Do not use infield mix for this purpose. <br />7.3.5 Backfill "mound-mix" material into hole(`s). <br />7.3.6 Tamp the area firmly with steel tamp. <br />Note: The tamp will be most effective if you cover the <br />bottom with plastic. Tape the plastic to the tamp <br />handle. The plastic keeps the clay from sticking to <br />the tamp's bottom. <br />7.3.7 After tamping and compacting the "mound mix" covers areas with <br />infield brick dust. <br />7.4 Pitcher's Mound <br />7.4.1 Follow same procedure for repair of home plate/batters box area <br />utilizing dry "mound mix" for this purpose. Do not cover with <br />infield mix. <br />7.4.2 Add to the above the following: Rake all loose material from <br />bottom to top and cover with "Mound Mix". <br />7.5 General Brickdust Skinned Infield Areas <br />7.5.1 After raking/shoveling loose material from high spots back into <br />low spots/worn areas on running paths, sliding zones, and any <br />other low spots/worn areas appearing on the field, the Contractor <br />shall fill all remaining low spots with new Gail Materials "Pro <br />Gold with Stabilizer" brickdust from stock and make level. <br />25A-41
The URL can be used to link to this page
Your browser does not support the video tag.