My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - REHAB MCFADDEN AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
23A - PROJ - REHAB MCFADDEN AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:48:40 AM
Creation date
7/31/2013 5:14:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />AUGUST 5, 2013 <br />TITLE: <br />CONTRACT AWARD FOR MCFADDEN <br />AVENUE REHABILITATION FROM WEST <br />CITY LIMIT TO EUCLID (PROJECT 13-6784) <br />AND FROM EUCLID TO NEWHOPE <br />(PROJECT 12-6776) <br />MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />? As Recommended <br />? As Amended <br />? Ordinance on 1" Reading <br />? Ordinance on 2ntl Reading <br />? Implementing Resolution <br />? Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to the lowest responsible bidder, All American Asphalt, Inc., in accordance <br />with the Base Bid totaling $995,243, for the construction of the McFadden Avenue <br />Rehabilitation from West City Limit to Euclid (Project 13-6784) and from Euclid to Newhope <br />(Project 12-6776). <br />2. Approve the Cost Analysis for a total estimated project delivery cost of $ $1,293,632. <br />DISCUSSION <br />The recommended action will allow the City to proceed with construction of the McFadden <br />Avenue Rehabilitation from West City Limit to Newhope Street. The project has received budget <br />and funding approval, and is part of the City's Capital Improvement Program. Project design is <br />complete and bid procedures have been followed, as established by the City's Municipal Code <br />and in adherence to the Public Contracts Code. <br />The City's Pavement Management System identified McFadden Avenue from West City Limit to <br />Newhope Street (Exhibit 1) as a high priority for rehabilitation. The pavement has deteriorated <br />due to weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and gutter, <br />driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require <br />replacement. Improvements include reconstructing the pavement, and replacing damaged <br />concrete curb and gutter, driveway approaches, and sidewalk. Once completed, these <br />improvements will extend the life of the pavement and enhance the ride quality, surface drainage, <br />and appearance of the street. <br />The Notice Inviting Bids was advertised on June 7 & 8, 2013, and bids were opened on June 27, <br />2013. A summary of the bid invitations mailed, bids received, and bid results are as follows: <br />23A-1
The URL can be used to link to this page
Your browser does not support the video tag.