My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23C - PROJ - FLOWER ST BIKE TRAIL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
23C - PROJ - FLOWER ST BIKE TRAIL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:49:06 AM
Creation date
7/31/2013 5:14:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23C
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award for the Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. <br />August 5, 2013 <br />Page 2 <br />The Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. project consists of installing <br />a 10-foot-wide asphalt bicycle trail, irrigation, and landscaping along the flood channel that runs <br />parallel to Flower Street, as shown in Exhibit 1. The proposed project will accomplish the <br />following objectives: <br />1) Provide regional commuter linkages within (and beyond) the city limits and expand <br />commuter opportunities on a regional level by connecting the Sunflower bike lane to the <br />Flower Street bike trail. <br />2) Expand recreational opportunities on a regional level, as the Golden Loop trail provides <br />linkages to extensive trail systems throughout Santa Ana and Costa Mesa that connect to <br />other neighboring cities in Orange County; <br />3) Improve safety of walkers, joggers, cyclists, skaters, and equestrian users, and allow full <br />trail accessibility for persons with disabilities; and <br />4) Address neighborhood concerns regarding the appearance of this section of Flower <br />Street. <br />The Notice Inviting Bids was advertised on June 7 & 8, 2013, and bids were opened on June 27, <br />2013. A summary of the bid invitations mailed, bids received, and bid results are as follows: <br />Contractor Participation Data <br />Santa Ana Contractors receiving notices: 16 <br />Contractors requesting bidding documents: 18 <br />Bids received: 9 <br />Bids received from Santa Ana Contractors: 0 <br />Bid Results Summary <br />RANK BIDDER NAMES LOCATION BASE BID <br />1 Green Giant Landscape, Inc La Habra $874,500.00 <br />2 Diversified Landscape Management, Inc. Corona $916,088.47 <br />3 CS Legacy Construction, Inc. Chino $924,784.00 <br />4 Two Brothers Construction Company Buena Park $930,329.43 <br />5 GMC Engineering, Inc. Tustin $934,000.00 <br />6 KASA Construction, Inc. Ontario $967,540.00 <br />7 YAKAR San Dimas $1,059,190.00 <br />8 Minako America Corporation dba Minco <br />Construction Gardena $1,259,340.78 <br />9 PUB Construction, Inc. Diamond Bar $1,349,016.74 <br />23C-2
The URL can be used to link to this page
Your browser does not support the video tag.