My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
25H - AGMT - ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:56:39 AM
Creation date
8/1/2013 10:03:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URS has successfully completed many projects within the City of Santa Ana and for the City over the past decades. <br />The projects listed below are examples of the considerable experience we have and highlight our staffs involvement <br />proposed for this contract. <br />? Edinger Avenue Reconstruction/Resurfacingi Santa Ana, CA - <br />URS performed pavement analysis, geotechnical investigation and prepared the plans, specifications and <br />estimates (PS&E) for rehabilitation of Edinger Avenue from Magnolia Avenue to Main Street. Work included <br />topographic survey, pavement reconstruction/resurfacing, replacement/installation of curbs, gutters, <br />sidewalks, driveways, bus pads, wheelchair ramps and traffic detector loops. In addition, utility manholes and <br />valve covers were adjusted to grade and traffic striping plans were prepared. All improvements were <br />incorporated to keep the total construction costs within <br />the limits of available City funds. <br />? MS4 NPDES Permit Support; Santa Ana, CA - URS <br />developed and prioritized an inventory of industrial and <br />commercial facilities within the City's jurisdiction as <br />required by the City's municipal separate storm sewer <br />system (MS4) NPDFS permit. "Windshield surveys" were <br />conducted for more than 1,000 facilities. Inspections were <br />conducted for more than 640 facilities and reports were <br />prepared to summarize the results. Enforcement <br />documentation was prepared for the City, including 125 <br />notifications to the Santa Ana Regional Water Quality <br />Control Board for facilities that were potentially in <br />violation of the General Permit for Storm Water Discharges <br /> <br />provided general storm water program compliance assistance, including review of model compliance programs <br />developed by the County of Orange. <br />? City of Santa Ann Public Works Agency OtrSite Assignmenq Santa Ana, CA - URS provided a project <br />engineer (Stephanie Hillebrand) to work on-cite in the City's engineering department. Stephanie provided <br />services ranging from engineering/CADD support to cost estimating on various City PS&E projects. Projects <br />included a street widening, pavement rehabilitation and overlay and aesthetic improvements for a period of <br />nearly half a year. In addition, Stephanie provided InRoads (engineering software) support to City design <br />engineers. <br />? Second Street Reconstruction; Santa Ana, CA - URS prepared PS&E for the complete reconstruction of <br />Second Street in downtown Santa Ana. Work included reprofiling of the street grades, utility relocations, storm <br />drain improvements, sidewalks, curbs, gutters and landscape enhancements. <br />? Edinger Avenue Landscaping; Santa Ana, CA - The project consisted of median improvements involving <br />planting, irrigation and accent paving along the arterial. The design focused on the preservation of existing trees <br />and the highlighting of neighborhood entries. <br />? Intersection Signalization Improvement Pojecp Santa Ana, CA - The project consisted of the addition of <br />protected lefttum pockets and signalized intersection improvements throughout the City. Restriping, new signal <br />equipment and carefully planned traffic control were the most important elements of the projects. <br />25H-15 <br />Project Manager. Jeff Chapman, PE Geu *lc Area <br />Project Engineer: Jeff Mills, PE; Stephanie Hillebiand, PE 7AsalgrW w1b City Staff <br />Between 1 993 through 1995 and 2002 through 2004, URS provided G4 Design, Consttidan <br />ures <br />? „ <br />similar design services for the City of Santa Ana on an onrall basis. and <br />Projects successfully completed as part of that contract included: by Key Pentgrt <br />s Co*a0l:, ""
The URL can be used to link to this page
Your browser does not support the video tag.