Laserfiche WebLink
Project Manager. Jeff Chapman, PE ± - <br />Project Engineer. Jeff Mills, PE <br />URS prepared schematic, preliminary and final design documents for street, Gonetrue6on <br />r'lw?tothis landscaping and park ing lot rehabilitation in the newly appointed me <br />"Cornerstone Village" community. The project scope included Ipteraetion <br />Key Personnel <br />reconfiguration of Minnie Street to one-way, landscaping enhancement, y <br />ract <br />pavement overlay and reconstruction, and parking lot renovation. Special <br />aesthetic considerations were critical components of this improvement project, which <br />included the addition of landscaped islands, entry pergola, community signage/monument, <br />new street lights and enhanced paving throughout the project. <br />This project was a tremendous success for the City and may provide a prototype for future <br />neighborhood enhancement projects throughout the City. The project received the 2002 <br />Project of the Year award from the Southern California Chapter of the American Public Works <br />Association. Both the schematic and design phases involved extensive local resident, property <br />owner and City agency collaboration. Jeff Chapman and Jeff Mills demonstrated their ability to <br />explore and resolve issues that arose on the project; particularly with respect to building <br />consensus among the variety of stakeholders involved in the project by identifying compromises <br />that allowed the project to continue moving forward. <br />Project Engineer: Jeff Chapman, PE Geographic Area <br />Xerox Centre, located near the Santa Ana and Costa Mesa freeways, is a high a`rdy with Ciy Desigi, Construction <br />rise office development consisting of office towers and parking structures. Speeikahons and Procedures <br />URS prepared designs for improvements to the local streets, sewer, water, and Projects Pedonned by Key Ps <br />storm drain facilities to accommodate the high density, lbacre development. Assigned ro the C&DI t <br />In the preliminary phases of the project, URS provided grading, utility and storm drainage studies, an ALTA surrey <br />and a tentative parcel map. Subsequently, street and utility improvement plans, landscaping plans and final parcel <br />maps were prepared. <br />The project included the design of an extension of Cabrillo Park Drive and widening and reconstruction of First and <br />Fourth Streets. Other design elements included storm drain, water and sewer facilities, retaining wall design, landscape <br />and hardscape improvements and traffic signal design and modifications. Construction staging and traffic handling <br />plans and specifications were developed to maintain traffic during construction. URS also assisted during the bidding, <br />contract award and construction phases of the project. <br />Project Manager. Jeff Mills, PE <br />Project Pdrtcipd: Jeff Chapman, PE pro <br />project Engineer: Stephanie Hlliebrand, PE , 'ltlgotitraat <br />Traffic Engineer: Doug Smith PE, TE ritiiv§ S?keholder Intsraction <br />URS is currently providing as-needed engineering design services to the County <br />of Riverside Transportation Department. Jeff Mills is the Project Manager and the following projects represent recent <br />task orders received as part of this effort: <br />? Clinton Keith Road Wideningi Riverside, CA -Completing the planning, engineering and environmental <br />studies and initiating the PS&E for the widening of a two-mile segment of Clinton Keith Road. The work <br />includes layouts/profiles, intersection design, drainage design, utility design, and traffic/electrical design. <br />UM <br />25H-16