? Domenigoni Parkway, Riverside County, CA -Project Geotechnical Engineer for preliminarygeotechnical
<br />investigation for approximately 7 miles of road and two bridges. Mike oversaw drilling and laboratory testing
<br />programs and prepared a geotechnical report.
<br />Professional Engineer/California
<br />PhU/StnwWrsl Meohanics/DynsmkeAlniveralty of Califomis, Irvine
<br />MS/Civil Engineering • Structural EmphasislCeiifomte Stele Polytechnic University, Pomona
<br />Melad has 27 years of highly successful professional experience in civil and structural engineering on a wide range of
<br />transportation infrastructure projects, including highway, heavy rail, light transit, and facilities. His expertise ranges
<br />from office operations, engineering manager, project management, hands-on-design, and construction management to
<br />computer programming. He has considerable experience with the preparation of PS&Es in accordance with state and
<br />federal requirements. His experience includes the design of major and minor structures, including steel trusses, plate
<br />girders, precast concrete, and cast-in-place post-tensioned concrete. Melad is an expert in using Finite Elements
<br />Method as it applies to linear and non-linear static and dynamic structural analysis of structures. Listed below are
<br />relevant projects:
<br />? Shoemaker Bridge Replacement PSR/PDS, City of Long Beach, CA - Melad was responsible for the review
<br />of structure maintenance records, review/documentation of seismic retrofit modifications, and preparation of
<br />an APS checklist, design memo, structure cost estimate, and APS plan/drawing. The project involved three
<br />structures.
<br />? SR-125 South Toil Road Design-Build, San Diego, CA --This $400M project involved a I&mile-long
<br />privately funded toll-road section of the public private SR-125 South Freeway project. SR 125 South involves
<br />the design and construction (design-build delivery method) of a 20.2 km (12.5 miles) limited access highway,
<br />which will run from Otay Mesa Road (State Route 905) near the Mexican border to SR 54 near Sweetwater
<br />Reservoir. The major elements of the Toll Road consists of approximately 14 Ion of a new four-lane highway,
<br />divided controlled access toll way facility, with climbing and auxiliary lanes, one toll plaza, five interchanges,
<br />six bridge undercrossings, two bridge overcrossings, a 1,012meter pre-cast segmental bridge over the Otay
<br />River, and a number of retaining walls, soundwalls, and mechanically stabilized earth (MSE) walls.
<br />? North Cart Path Pedestrian Overcrossing, Newport Beach, CA -Melad was responsible for the preparation
<br />of the PS&E for this pedestrian overcrossing. The overcrossing is two-spans, 60 feet long and I I feet wide.
<br />The superstructure is supported by one reinforced concrete pier with the dimensions: 11 feet deep, 18.5 feet
<br />wide and 34 feet high. He was also responsible for the design of two open-end concrete abutments. The
<br />abutments and pier are supported by spread footings, and the superstructure is a wood structure.
<br />4.0 Subconsultants
<br />4.1 Coast Surveying
<br />Coast Surveying was founded in 1981 and brings more than 26 years of surveying, mapping and right-of way
<br />engineering experience working for government agencies such as the City of Santa Ana, Caltrans - Districts 5, 6, 7, 8,
<br />9, 11 and 12; OCTA and the counties of Orange and Los Angeles, among others. Coast Surveying is a financially
<br />stable company with 18 employees. The firm's Corporate Principal is Ruel del Castillo, PLS; he will lead the surveying
<br />effort for this contract. Recent projects completed by Coast in the City of Santa Ana include:
<br />? Three Bridge Rehabilitation Projects in Santa Ana for the City of Santa Ana
<br />? Santiago Park Street Design Surveys
<br />? Wilshire Avenue, Elder Avenue and Borchard Avenue Design Surveys
<br />? Santiago Park Habitat Facility Building Topographic Survey
<br />? Fire Station 4 and Fire Station 8 Design Surveys
<br />? Main Street (Warner Avenue to 8th Street) Aerial Mapping, Design Surveys, and Right-of'Way
<br />? Thornton Park Topographic Survey
<br />? Santa Ana Civic Center Topographic Survey for Drainage Resolution