INFRASTRUCTURE & ENVIRONMENT <br />REQUEST FOR APPROVAL <br />1/16/13 RFA SNA001 <br />Santa Ana Delhi <br />Urban Discharge Diversion <br />Project <br />Task 1.05 - Encroachment Permits and Approvals: URS will obtain encroachment permits for work activities within the <br />public rights of way for the following: <br />• City of Newport Beach <br />• City of Costa Mesa <br />• County of Orange - Airports <br />• County of Orange - OCFCD <br />• California Department of Transportation (Caltrans) <br />Task 1.06 - Addenda Preparation and Pre-Bid Meeting: URS will provide bidding support and assistance as it pertains <br />to the contract documents and construction drawings of the interim improvements. For budgetary purposes, we have <br />assumed a number of hours in our fee estimate to answer questions from prospective bidding contractors, and assist the <br />City of Santa Ana in providing information and clarification of the bid documents. URS will consult with the City of Santa <br />Ana to address concerns or answer their questions in support of administering the bid process. URS will prepare four (4) <br />addenda for all prospective bidders, if requested by City of Santa Ana. <br />P°fN1!#R}??#MEgbIA? RlA#1N6eS6kTfi$ <br />Task 2.01 - Prepare CEQA Initial Study/MND: URS will prepare a draft CEQA Initial Study (IS)/Mitigation Negative <br />Declaration (MND) in accordance with the current CEQA Guidelines and Appendices. URS will begin with the preparation <br />of the project description, in consultation with the City, and incorporating the following maps and other existing <br />background data to the extent possible: <br />• A regional map and project site map(s) illustrating the boundaries of the project area; <br />• A statement of the project objectives, prepared in coordination with the City. <br />• A statement briefly describing the intended uses of the IS/MND including a list of agencies that are expected to <br />use the IS/MND in decision making/permitting and a list of the discretionary approvals for which the IS/MND will <br />be used; <br />• A discussion of the environmental setting; and regional setting with special emphasis on rare or unique <br />environmental resources. <br />The IS will include a summary of the existing environmental conditions using information readily available, such as the <br />EIR for the Santa Ana-Delhi Channel Widening project. URS will then evaluate potential impacts of the project using the <br />CEQA IS checklist form. Impact discussions will cover potential short-term construction impacts and potential long-term <br />impacts of the low flow diversion project, including pipelines. For each environmental topic listed in the checklist, URS will <br />conduct an appropriate level of analysis to support the findings of impact required. As needed, a list of mitigation <br />measures will be included to reduce any potential impacts to less than significant. For this effort, URS will utilize our in- <br />house technical specialists in biology, cultural resources, noise, traffic, air quality, water quality and hydrology to <br />adequately assess the environmental topics. No separate technical studies will be prepared for the CEQA IS, other than <br />the biological resource technical report and the cultural resources record search summary letter discussed later in this <br />scope of work. Based on our experience with environmental issues in the local area including Upper Newport Bay, it is <br />likely that impacts can be reduced to less than significant levels with incorporation of mitigation measures, and therefore, <br />the IS will most likely lead to a MND. <br />URS will submit the Draft IS/MND to the City in electronic format for up to two rounds of review and comment. If needed, <br />URS will meet with the City to discuss comments for incorporation into the final IS/MND. On the basis of this second <br />Pagel 3 <br />T'.\071\CITV OF SANTA ANA\URBAN DISCHARGE WATER DIVERSION (29880113)\2 - CONTRACTS\A. CONTRACT\2 - CHANGE <br />ORDERS\REQUEST FOR APPROVAL 001 - 20120803.DOCX <br />25H-45