My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
25H - AGMT - ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:56:39 AM
Creation date
8/1/2013 10:03:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? REQUEST FOR APPROVAL <br />Santa Ana Delhi <br />Urban Discharge Diversion <br />Proiect <br />Orange County Public Works/Orange County Flood Control District/OC Watersheds <br />300 North Flower Street <br />Santa Ana, CA 92703 <br />714-834-2300 <br />City of Newport Beach <br />City of Costa Mesa <br />URS will prepare easement exhibits describing the required properties for the implementation of the project. All exhibits <br />will be provided to the City of Santa Ana for review and approval. Upon approval, City of Santa Ana will prepare all <br />required legal descriptions and plats required to describe and negotiate the procurement of required easements. <br />Task 1.02 - Project Surveying Services (to be provided by others): URS will prepare a description and exhibit <br />identifying the area to be surveyed for the development of the project. Required surveying services will include the <br />following: <br />Survey Based Mapping 1 "=40' project site area, Mesa Drive from the intersection of Mesa Drive and Irvine <br />Avenue to Mesa Drive and Newport Boulevard South, Newport Boulevard South to Fair Drive. Base mapping <br />shall include identification of manholes and provide dips to inverts of all sanitary and storm drain facilities. <br />Ground surveys shall locate all existing surface utility appurtenances including but not limited to vaults, valve <br />cans, fire hydrants, street lights, power poles, storm drain inlets, etc. <br />The survey base map shall be provided in a digital format compatible with Microstation. <br />Task 1.03 - Project Pothole Services: URS will contract with SAF-r-DIG to perform utility potholing for visual verification, <br />identification, inspection, measurements, and vertical and horizontal location of the existing utilities not obtained during <br />the site survey. <br />Task 1.04 - Construction Documents/Specifications/Opinion of Probable Costs: URS will prepare final engineering <br />documents to include construction documents, project specifications and opinion of probable construction costs based on <br />the following: <br />• Title Sheet -1 sheet <br />• Project Details and General Notes - 1 sheet <br />• Site Layout and Equipment Arrangement -1 sheet <br />• Diversion Facility Layout and Details - 2 sheets <br />• Storage Complex Layout and Details - 2 sheets <br />• CDS Layout and Details - 2 sheets <br />• Pump Station Layout and Details - 2 sheets <br />• Electrical Layout and Details - 2 sheets <br />• Force Main Plan and Profile - 17 sheets <br />• Force Main Details - 2 sheets <br />• Erosion Control Plan and Details -11 sheets <br />• Traffic Control/Traffic Management - 10 sheets <br />• Structural Details-4 sheets <br />Sheet Count Total - 57 sheets <br />• Draft SWPPP <br />• Project Specifications <br />• Project Opinion of Probable Costs <br />Pagel 2 <br />T.\071\CITV OF SANTA ANA\URBAN DISCHARGE WATER DIVERSION (29880113)\2 - CONTRACTS\A. CONTRACT\2 -CHANGE <br />ORDERS\REQUEST FOR APPROVAL 001 - 20120803.DOCX <br />25H-44
The URL can be used to link to this page
Your browser does not support the video tag.