My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
FULL PACKET_2013-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:20:22 PM
Creation date
8/1/2013 3:57:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1044
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manager. Jeff Chapman, PE ± - <br />Project Engineer. Jeff Mills, PE <br />URS prepared schematic, preliminary and final design documents for street, r'lw�tothis Gonevue6on <br />landscaping and parking lot rehabilitation in the newly appointed me <br />"Cornerstone Village" community. The project scope included M>eracdon Key Personnel <br />reconfiguration of Minnie Street to one -way, landscaping enhancement, y pavement overlay and reconstruction, and parking lot renovation. Special ect <br />aesthetic considerations were critical components of this improvement project, which <br />included the addition of landscaped islands, entry pergola, community signage /monument, <br />new street lights and enhanced paving throughout the project. <br />This project was a tremendous success for the City and may provide a prototype for future <br />neighborhood enhancement projects throughout the City. The project received the 2002 <br />Project of the Year award from the Southern California Chapter of the American Public Works <br />Association. Both the schematic and design phases involved extensive local resident, property <br />owner and City agency collaboration. Jeff Chapman and Jeff Mills demonstrated their ability to <br />explore and resolve issues that arose on the project; particularly with respect to building <br />consensus among the variety of stakeholders involved in the project by identifying compromises <br />that allowed the project to continue moving forward. <br />Project Engineer: Jeff Chapman, PE ephic Area <br />Xerox Centre, located near the Santa Ana and Costa Mesa freeways, is a high a`rdy with Ciy Desigi, Construction <br />rise office development consisting of office towers and parking structures. Speeikahons and Procedures <br />URS prepared designs for improvements to the local streets, sewer, water, and Frojecti; Pedonned by Key Ps <br />storm drain facilities to accommodate the high density, lbacre development. Assigned ro the Conte <br />In the preliminary phases of the project, URS provided grading, utility and storm drainage studies, an ALTA surrey <br />and a tentative parcel map. Subsequently, street and utility improvement plans, landscaping plans and final parcel <br />maps were prepared. <br />The project included the design of an extension of Cabrillo Park Drive and widening and reconstruction of First and <br />Fourth Streets. Other design elements included storm drain, water and sewer facilities, retaining wall design, landscape <br />and hardscape improvements and traffic signal design and modifications. Construction staging and traffic handling <br />plans and specifications were developed to maintain traffic during construction. URS also assisted during the bidding, <br />contract award and construction phases of the project. <br />Project Manager. Jeff Chapman, PE b <br />Project Pdrtcipd: Jeff Chapman, PE po <br />Project Engineer: Stephanie Hlliebrand, PE WIN <br />Traffic Engineer: Doug Smith, PE, TE ritiiv§ Stakeholder Iniaraction <br />URS is currently providing as-needed engineering design services to the County <br />of Riverside Transportation Department. Jeff Mills is the Project Manager and the following projects represent recent <br />task orders received as part of this effort: <br />► Clinton Keith Road Wideningi Riverside, CA -Completing the planning, engineering and environmental <br />studies and initiating the PS&E for the widening of a two-mile segment of Clinton Keith Road. The work <br />includes layouts/profiles, intersection design, drainage design, utility design, and traffic/electrical design. <br />25H -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.