Laserfiche WebLink
► De portola Road Reconstruction; Riverside, CA - Provided preliminary engineering, environmental studies, <br />and PS &E services for two 2-mile pavement reconstruction projects. The work included highway geometries, <br />preliminary and final design, intersection design, grading, pavement MEOW <br />design, and drainage design. The drainage design included hydrologic g wlh CAy Personnel <br />and hydraulic analysis to size cross culverts. Environmental studies ✓ projects Petloimed by Key Pamorerai . <br />included wetlands delineations and biological surveys. A�Igned to this canttaet <br />xa <br />► Glenoaks Road Reconstruction; Riverside, CA - Provided preliminary <br />engineering, environmental studies, and PS &E services for a 2.7-mile pavement reconstruction project. The <br />work included highway geometries, preliminary and final design, intersection design, grading, pavement <br />design, and drainage design. URS also performed the field survey and prepared the biological resources <br />report. <br />Traffic Engineer: Noel Cavil, PE <br />The City of Pasadena retained URS to prepare channelization plans to W. tsoreiel <br />improve the segment of South El Molino Avenue between California <br />Boulevard and Oak Knoll Circle to reduce traffic speed and improve lEngtireering hnprommits <br />roadway safety. Key project tasks included the preparation of signing and striping plans to be used in the <br />construction of physical improvements aimed at calming traffic along this street. Additional civil engineering <br />improvements, such as curb and gutter realignment, grading and drainage improvements associated with the final <br />design were also included to match with the required street profile to facilitate the flow of street runoff. <br />Project Manager. Jeff Chapman, PE �°iie gh nhact <br />Project Engineer Jeff Mills, PE Pro)ecis Perfomred by Key Pwomel <br />This on-call civil engineering design contract was completed for the U.S. Asst W to tide Cana -' <br />Navy and involved a wide variety of technical assignments throughout southern California. Over a span of two <br />years, 16 separate projects were completed on schedule and within budget. Due to the volume of work required <br />and the aggressive nature of several project schedules, URS mobilized up to three design teams concurrently to <br />meet the client's needs, Projects completed under this contract included parking lot reconstruction, roadway <br />reconstruction and/or overlay repairs, drainage improvements, design of a native tree park, airfield pavement <br />repairs, sewer system studies, retaining walls, landscaping restoration, landslide repairs, utility improvements and <br />minor structural and architectural improvement projects. <br />1.3 Subconsultant Projects <br />Coast performed survey research at the City of Santa Ana and the County 7=' `"" <br />of Orange for horizontal and vertical control, centerline ties, right-of-way Performed by Key Pereonnel , <br />maps, record maps, and any other pertinent information. Additionally, Eo Mie n <br />Coast placed aerial photogrammetric control targets on the ground and determined appropriate horizontal and <br />vertical control positions upon them and prepared aerial photogrammetric mapping and performed design <br />surveys. <br />Tatsumi and Partners was the landscape architectural firm on the engineering design team that won an on -call <br />contract with the City of Santa Ana. As part of that on -call contract, Tatsumi and Partners completed two park <br />renovation/upgrade PS &E packages: Santiago Park and Morrison Park. Tatsumi and Partners was the landscape <br />` architectural subconsultant assigned to design the renovation of the park As part of the new safety regulations <br />25H -17 <br />