My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
FULL PACKET_2013-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:20:22 PM
Creation date
8/1/2013 3:57:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1044
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client: <br />INFRASTRUCTURE & ENVIRONMENT <br />REQUEST FOR APPROVAL <br />CITY OF SANTA ANA PUBLICS WORKS DEPARTMENT <br />20 CIVIC CENTER PLAZA, ROSS ANNEX M -20 <br />Address of Home Office P.O. BOX 1988 <br />SANTA ANA, CALIFORNIA 92702 <br />Primary Contact: CARLOS CASTELLANOS, PE, QSP /D <br />Phone N2 714- 647 -5642 FAX N2 <br />Email CCastellanos @santa - ana.org <br />RFA NO 001 <br />1/16/13 1 RFASNA001 <br />Santa Ana Delhi <br />Urban Discharge Diversion <br />Proiaet <br />DATE January 14, 2013 <br />Agreement No. URS PN <br />The City of Santa Ana in collaboration with the Cities of Newport Beach and Costa Mesa are currently in the preliminary <br />engineering and planning phase of an Urban Discharge Diversion Project. URS has provided preliminary engineering and <br />analysis to develop the project location; identify required improvements associated with the physical diversion facility and <br />generalized evaluations of anticipated construction and operation costs. Due to the fact that the proposed project will <br />provide multi - jurisdictional benefits through the elimination of Urban Runoff (Dry- weather Runoff) Discharge into the Upper <br />Newport Bay and will provide for a beneficial improvement of water quality with the bay, the project is qualified to <br />potentially be awarded grant funding OCTA Measure M — Environmental Cleanup Program. <br />Qualification of the project for grant funding requires the completion of the project Plans, Specification and Estimates. As <br />requested by the City of Santa Ana, URS is providing the following to progress the project to final engineering and shovel <br />ready status to provide the most competitive grant application and ultimately meet the funding requirements. <br />In general, as a continuation of services being provided under Agreement no. A- 2008 - 217 -01 — Engineering and <br />Landscape Architectural Services task assignment, Urban Runoff Diversion project, URS will prepare final engineering <br />and construction documents for the implementation of the project as described in the following tasks: <br />TAW QRwP 1— ,PREGfl mAlt'P;Wallomm SERyicES <br />Task 1.01 - Project Coordination with Project Stakeholders: URS will provide coordination and organize project <br />meetings regarding the development of the project as specifically related to obtaining easements and rights of entry onto <br />private properties as identified below: <br />Newport Beach Golf Club <br />3100 Irvine Avenue <br />Newport Beach CA 92660 <br />(949) 852 -8681 <br />Exhibit 3 <br />Pagel 1 <br />T: \071 \CITY OF SANTA ANA \URBAN DISCHARGE WATER DIVERSION (29880113) \2 - CONTRACTS\A. CONTRACT\2 - CHANGE <br />ORDERS \REQUEST FOR APPROVAL 001 - 20120803.DOCX <br />25H -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.