My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
FULL PACKET_2013-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:20:22 PM
Creation date
8/1/2013 3:57:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1044
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR APPROVAL I 1116/13 I RFASNA001 <br />Santa Ana Delhi <br />Urban Discharge Diversion <br />Proiect <br />Orange County Public Works /Orange County Flood Control District/OC Watersheds <br />300 North Flower Street <br />Santa Ana, CA 92703 <br />714 - 834 -2300 <br />City of Newport Beach <br />City of Costa Mesa <br />URS will prepare easement exhibits describing the required properties for the implementation of the project. All exhibits <br />will be provided to the City of Santa Ana for review and approval. Upon approval, City of Santa Ana will prepare all <br />required legal descriptions and plats required to describe and negotiate the procurement of required easements. <br />Task 1.02 — Project Surveying Services (to be provided by others): URS will prepare a description and exhibit <br />identifying the area to be surveyed for the development of the project. Required surveying services will include the <br />following: <br />Survey Based Mapping 1 " =40' project site area, Mesa Drive from the intersection of Mesa Drive and Irvine <br />Avenue to Mesa Drive and Newport Boulevard South, Newport Boulevard South to Fair Drive. Base mapping <br />shall include identification of manholes and provide dips to inverts of all sanitary and storm drain facilities. <br />Ground surveys shall locate all existing surface utility appurtenances including but not limited to vaults, valve <br />cans, fire hydrants, street lights, power poles, storm drain inlets, etc. <br />The survey base map shall be provided in a digital format compatible with Microstation. <br />Task 1.03 — Project Pothole Services: URS will contract with SAF -r -DIG to perform utility potholing for visual verification, <br />identification, inspection, measurements, and vertical and horizontal location of the existing utilities not obtained during <br />the site survey. <br />Task 1.04 — Construction Documents /Specifications /Opinion of Probable Costs: URS will prepare final engineering <br />documents to include construction documents, project specifications and opinion of probable construction costs based on <br />the following: <br />• Title Sheet —1 sheet <br />• Project Details and General Notes — 1 sheet <br />• Site Layout and Equipment Arrangement —1 sheet <br />• Diversion Facility Layout and Details — 2 sheets <br />• Storage Complex Layout and Details — 2 sheets <br />• CDS Layout and Details — 2 sheets <br />• Pump Station Layout and Details — 2 sheets <br />• Electrical Layout and Details — 2 sheets <br />• Force Main Plan and Profile — 17 sheets <br />• Force Main Details — 2 sheets <br />• Erosion Control Plan and Details —11 sheets <br />• Traffic Control/Traffic Management — 10 sheets <br />• Structural Details -4 sheets <br />Sheet Count Total — 57 sheets <br />t sTr7i&"itiV]a5 <br />• Project Specifications <br />• Project Opinion of Probable Costs <br />Pagel 2 <br />T. \071 \CITY OF SANTA ANA \URBAN DISCHARGE WATER DIVERSION (29880113) \2 - CONTRACTS\A. CONTRACT\2 -CHANGE <br />ORDERS \REQUEST FOR APPROVAL 001 - 20120803.DOCX <br />25H -44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.