Laserfiche WebLink
Alternatives Analyzed <br />• Reduced Set of Alternatives Evaluated in Environmental Assessment <br />(EA) / Draft Environmental Impact Report (DEIR) (Nov 2012): <br />- No Build <br />- Transportation System Management (TSM) <br />o Changes to Existing OCTA Bus System <br />o Low Cost <br />- Streetcar 1 <br />- Streetcar 2 <br />Streetcar Alternatives <br />To ARC .y: Metrollnk/ <br />,', j""• Amtrak to <br /> Los Angeles <br />Ga, en C- <br />NeqlonalTmnslt <br />A <br />- <br />Ana <br />$ <br />3 <br />$_ <br />7 <br />Conrsect- Station ,y, 3 <br />y? <br /> Galkge wnw.psw. <br />ODISA <br /> Future <br />Dow <br />j <br /> vN <br />nr <br />v 0 <br />C <br />i <br />A <br /> k 11 <br />n <br />ric <br />Golr <br />Courw o.s c.. w. <br />o <br />r <br />Ci <br />vic ommerc <br />S <br />RTC <br />v d i "? <br /> <br />srn N. Center un = <br />nntrHt t <br /> <br /> <br /> <br /> Metrolink/ <br /> Amtrak to <br />San Diego <br />LEGEND <br /> <br />? Streetcar 1 <br />su-tcar 7 <br />O Proposed Step <br />5wdy A.i, <br />W Ridership <br />TSM/Bus Streetcar Streetcar <br />1 2 <br />1. Ridership projections for streetcar alternatives based on average of <br />high and low forecasts <br />Streetcar Economic Development Potential <br />MINUTES SPECIAL MEETING 4 JULY 23, 2013