My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-23 Special
Clerk
>
Minutes
>
CITY COUNCIL
>
2010-2019
>
2013
>
2013-07-23 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 11:10:29 AM
Creation date
8/8/2013 2:32:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Agency
Clerk of the Council
Date
7/23/2013
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• In Portland, $3.5 billion was invested within 2 blocks of the initial <br />streetcar alignment <br />• In Seattle, $2.4 billion in investment occurred within 3 blocks of the <br />streetcar line <br />• Tampa gained $1 billion in investment within 3 blocks of its streetcar <br />line <br />• Little Rock attracted $816 million in capital investment along its 3-mile <br />River Rail streetcar corridor within 10 years <br />• Santa Ana/Garden Grove investment potential being evaluated as part <br />of the next phase of the project. <br />• Preliminary analysis anticipates a similar level of investment as Little <br />Rock. <br />Streetcar Economic Development Potential <br />Cost Estimates <br />TSM/Best Bus' $16.4 $13.2 $1.5 $13.2 $14.7 <br />Streetcar 1 $238.0 $4.9 $16.9 $4.9 $21.8 <br />Streetcar 2 $257.0 $6.1 $18.4 $6.1 $24.5 <br />1. All costs in millions <br />2. Annualized Costs are based on a 12-year bus and a 25-year streetcar <br />useful life per FTA depreciation schedule <br />3. Full cost, including previously funded phases, year of expenditure, <br />Cordoba Corporation, July 2013 <br />4. Includes O&M costs for travel time improvements outside the study <br />area <br />Cost Comparison to Other Systems <br />With a pre-construction capital cost estimate of $47.5 million per mile, the <br />cost of the Santa Ana-Garden Grove system is on par with other streetcar <br />and BRT systems being planned and/or built: <br />• Tucson's nearly completed streetcar cost $50.5 million/mile <br />• Seattle's First Hill streetcar will cost $53.6 million/mile <br />MINUTES SPECIAL MEETING 5 JULY 23, 2013
The URL can be used to link to this page
Your browser does not support the video tag.