My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREEN GIANT LANDSCAPE, INC. (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GREEN GIANT LANDSCAPE, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 2:12:45 PM
Creation date
8/29/2013 7:08:20 AM
Metadata
Fields
Template:
Contracts
Company Name
GREEN GIANT LANDSCAPE, INC.
Contract #
12-2620
Agency
Public Works
Council Approval Date
8/5/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award for the Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. <br />August 5, 2013 <br />Page 2 <br />The Flower Street Bike Trail from MacArthur Blvd. to Sunflower Ave. project consists of installing <br />a 10 -foot -wide asphalt bicycle trail, irrigation, and landscaping along the flood channel that runs <br />parallel to Flower Street, as shown in Exhibit 1. The proposed project will accomplish the <br />following objectives: <br />1) Provide regional commuter linkages within (and beyond) the city limits and expand <br />commuter opportunities on a regional level by connecting the Sunflower bike lane to the <br />Flower Street bike trail. <br />2) Expand recreational opportunities on a regional level, as the Golden Loop trail provides <br />linkages to extensive trail systems throughout Santa Ana and Costa Mesa that connect to <br />other neighboring cities in Orange County; <br />3) Improve safety of walkers, joggers, cyclists, skaters, and equestrian users, and allow full <br />trail accessibility for persons with disabilities; and <br />4) Address neighborhood concerns regarding the appearance of this section of Flower <br />Street. <br />The Notice Inviting Bids was advertised on June 7 & 8, 2013, and bids were opened on June 27, <br />2013. A summary of the bid invitations mailed, bids received, and bid results are as follows: <br />Contractor Participation Data <br />Santa Ana Contractors receiving notices: <br />16 <br />Contractors requesting bidding documents: <br />18 <br />Bids received: <br />9 <br />Bids received from Santa Ana Contractors: <br />0 <br />Bid Results Summary <br />RANK <br />BIDDER NAMES <br />LOCATION <br />BASE BID <br />1 <br />Green Giant Landscape, Inc <br />La Habra <br />$874,500.00 <br />2 <br />Diversified Landscape Management, Inc. <br />Corona <br />$916,088.47 <br />3 <br />CS Legacy Construction, Inc. <br />Chino <br />$924,784.00 <br />4 <br />Two Brothers Construction Company <br />Buena Park <br />$930,329.43 <br />5 <br />GMC Engineering, Inc. <br />Tustin <br />$934,000.00 <br />6 <br />KASA Construction, Inc. <br />Ontario <br />$967,540.00 <br />7 <br />YAKAR <br />San Dimas <br />$1,059,190.00 <br />8 <br />Minako America Corporation dba Minco <br />Construction <br />Gardena <br />$1,259,340.78 <br />9 <br />PUB Construction, Inc. <br />Diamond Bar <br />$1,349,016.74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.