My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - CABLING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/03/2013
>
25F - AGMT - CABLING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 5:13:04 PM
Creation date
8/29/2013 4:58:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25F
Date
9/3/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> APPENDIX A Proposal Response Form <br /> (Continued) <br /> <br /> Sample Job #1: <br /> <br /> Scope of Work: Provide and install (4) Category 5e cables, at 200 feet each, to the same <br /> location in an air return ceiling area. Two cables will be terminated into a contractor- <br /> provided 24-port patch panel on one-side and 8P8C-type Category 5e modules on the <br /> station side; the other two cables will be terminated into a contractor-provided 300FT 110- <br /> block assembly and again 8P8C-type Category 5e modules on the station side. Assume a <br /> clear path in the ceiling to the patch panel and the station side, utilizing Erico J-hooks in <br /> the ceiling for cable pathway support. On the station side, assume there is flex conduit <br /> running from a single gang outlet box to the top of the wall, in a stub-out fashion. <br /> 1) Provide a breakdown of hours to be billed. <br /> Place Cable including J-hook cable supports - 11.21 Hours <br /> Terminate Work Station and IDF - 1.04 Hours <br /> Install Panels, Blocks, Test and Label at IDF End 1.25 Hours <br /> Total 13.5 Hours <br /> 2) Provide a breakdown of cost of materials. <br /> 2061 Plenum Cat 5e Cable: 244.36 <br /> Cable supports including j-hooks & support rod $131.81 (based on 125• of cable support) <br /> Termination and Labeling, includes jacks, patch panel, 110 block & labels: 224.19 <br /> Sales Tax: 48.03 <br /> 3) Provide details and amounts of any and all other charges that would be billed to the <br /> City. <br /> Total Labor and Material $1,319.51 <br /> <br /> <br /> 4) Provide approximation of elapsed time to complete work, beginning from authorization <br /> to final acceptance. <br /> <br /> 5 business days <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Page 7 of 9 <br /> 25F-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.