Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> APPENDIX A Proposal Response Form <br /> (Concluded) <br /> Sample Job #2: <br /> <br /> Scope of Work: Contractor shall provide and install one (12/6)-multi-mode / single mode, <br /> fiber optic cable running from the basement Equipment Room ERB.2 to the 8lh floor <br /> Telecommunications Closet TC8.1. Fiber optic cable will terminate in ERB.2 onto an <br /> appropriately configured CommScope SYSTIMAX LGX Fiber Optic Distribution System, <br /> using an LST1U-072/7 shelf with ST-type connectors. In TC8.1, fiber optic cable should <br /> terminate onto an appropriately configured CommScope SYSTIMAX Sliding Combination <br /> Shelf, using a 60082 One-Unit High type shelf with ST-type connectors. Rack space <br /> required exists at both termination points. One, empty 4-inch conduit exists between <br /> ERB.2 and TCB.1 (the Basement Telecommunications Closet that is vertically stacked <br /> with the rest of the floors including our destination closet, TC8.1). Contractor shall provide <br /> and install (4) one inch, non-plenum, corrugated innerduct from ERB.2 to TCB.1 via <br /> existing 4-inch conduit noted above which is 150 ft in length. At exit point of conduit, <br /> transition (1) of (4) installed innerduct to (1) one inch, riser-rated, corrugated innerduct, <br /> which will traverse from the basement, stacked Telecommunications Closet, TCB.1, up to <br /> TC8.1. Contractor shall provide (1) 4-inch core hole between TCB.1 and TC1.1. Building <br /> Facilities Management has determined that floor is clear of obstruction for 4-inch core. <br /> Core hole shall be sleeved, and fire stopped per local, state, and industry standard codes. <br /> 1) Provide a breakdown of hours to be billed. <br /> Innerduct and Fiber optic Cable Placement - 24 hours <br /> Layout and Sleeve for one core, fire stop riser - 10.3 hours <br /> Terminate, Install Housings, Testing and Labeling - 15.7 hours <br /> Total - 50 Hours <br /> 2) Provide a breakdown of cost of materials. <br /> • 400' Fiber optic cable 12/6 f12-strand 50um mm / 6-strand single-mode: $689.60 <br /> Note: Minimum purchase of composite fiber optic cable is 1640' <br /> • 1240' Fiber optic cable 12/6 r12-strand 50um mm / 6-strand single-mode for stock: $2,137.66 <br /> • 800' Riser Rated Innerduct based on (4) runs x 150' plus(1) run of 200' to route up <br /> riser from TCB.1, up to TC8.1 $547.02 <br /> • Termination Material: $1.331.92 <br /> • Sleeve and Fire Stop Material: $369.28 <br /> • Total Material: $5,075.78 <br /> • Sales Tax: A.06.05 <br /> <br /> 3) Provide details and amounts of any and all other charges that would be billed to the <br /> City. <br /> Sub-contract for concrete coring services $1,233.33 <br /> <br /> TOTAL Cost of Project including Labor, Materials and sub-contract: $9,200.11 <br /> <br /> <br /> 4) Provide approximation of elapsed time to complete work, beginning from authorization <br /> <br /> <br /> Page 8 of 9 <br /> 25F-19 <br />