My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/03/2013
>
FULL PACKET_2013-09-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:19:22 PM
Creation date
9/3/2013 7:47:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/3/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreements with Sierra Pacific Electrical and SCE <br />to Provide, Install, and Fund LED Mast Arm Streetlights <br />September 3, 2013 <br />Page 2 <br />Twelve of the original installation locations involving 39 street lights did not meet SCE funding <br />criteria. However, staff subsequently negotiated with SCE to obtain approval of those 39 <br />streetlights and identified 22 additional streetlights at 6 more sites. The installation agreement with <br />Sierra Pacific Contracting requires an increase of $15,000 to cover the amended contract cost. <br />SCE will fund the installation of the 61 streetlights through an additional $7,409 in incentives, and <br />$29,680 in OBF, for a total of $37,089. Payback for the financed portion of this project is estimated <br />to be about five years. <br />ENVIRONMENTAL IMPACT <br />Installation of the additional 22 LED streetlights will save an estimated 20,000 kWh annually. This <br />savings translates to a reduction of the city's carbon footprint by approximately 14.1 metric tons of <br />CO2, which is the equivalent of removing 2.9 passenger vehicles from the road. <br />FISCAL IMPACT <br />Loan proceeds received through the SCE On -Bill Financing Program will be deposited in the <br />Energy Conservation revenue account (No. 16217002 - 57384) and appropriated into the Energy <br />Conservation expenditure account (No. 16217630 - 62300). Loan repayments are available in <br />Account No. 01117630 - 62000. <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />Edwin "William" Galve Francisco Gutierrez <br />Interim Executive Dip6ctor Executive Director /�_ <br />Public Works Agency Finance & Management Services Agency <br />'y <br />Exhibits: 1. Amendment to agreement with Sierra Pacific Electrical Contracting <br />2. On -Bill Financing Agreement with Southern California Edison <br />3. Streetlight Location Summary <br />4. Photo — Typical Mast Arm Streetlight <br />20D -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.