My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 8F - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PLANNING CENTER, THE 8F - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 3:53:26 PM
Creation date
9/19/2013 10:58:41 AM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2013-025
Agency
PUBLIC WORKS
Council Approval Date
2/4/2013
Expiration Date
6/30/2014
Insurance Exp Date
7/1/2014
Destruction Year
2020
Notes
Amends A-2007-167, A-2008-139, -001, -002, -003, A-2012-074 Amended by A-2013-025-01
Document Relationships
PLACEWORKS FORMERLY KNOWN AS THE PLANNING CENTER 8g - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8B - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8C - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8D - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8E - 2012
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 10, 2012 <br />Page 4 <br />ENGINEERING <br />Project Management, Meetings, and Coordination <br />I81 engineering staff will coordinate and attend a Project Development Team (PDT) meeting to discuss the desired <br />modifications to the PE design and Plans. IBI engineering staff will also attend any subsequent meetings <br />necessary and will be responsible for leading the discussion for any engineering related items in the agenda. 181 <br />will provide meeting notes for each meeting related to items discussed regarding engineering - related agenda <br />items. <br />Project Seeping and Development of Build Alternatives <br />The city has indicated at least one more alternative which shall be analyzed and could be part of the Preferred <br />Alternatives. IBI will provide support to the City for the additional alternative design. <br />Hydrology Study (Conceptual WQMP) and Drainage Report <br />Subsequent to the modification of the preferred build alternative by the City, the Preliminary Drainage Report <br />shall be revlsed to Include the additional modifications requested and any other details needed to address other <br />City requests. <br />Preliminary Engineering Plans <br />Subsequent to the modification of the preferred Build Alternative by the City, the PE plans shall be revised to <br />include the additional modifications requested and any other details needed to address other City requests. <br />Cost Estimates <br />The preliminary cost estimate shall be updated to reflect not only the modifications of the preferred build <br />alternative design but also current (2011) unit cost for all pay items identified in the estimate. <br />Preliminary Engineering Report <br />The PE report will be updated with the newest information from the following sections: <br />Civil Roadway <br />Traffic Analysis <br />Utilities and Drainage <br />- Right-of-way <br />Based upon the discussion items identified above, The IBI Group will prepare a final report to submit to City staff <br />for review and concurrence. <br />TRAFFIC IMPACT ANALYSIS <br />IBI Group will update the Traffic Impact Analysis (TIA) Report previously prepared and completed in April 2010 for <br />the Warner Avenue project according to the latest adopted City of Santa Ana standards and guidelines and new <br />case law. This augment request incorporates the following additional work elements beyond our original scope of <br />work: <br />
The URL can be used to link to this page
Your browser does not support the video tag.