My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 8F - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PLANNING CENTER, THE 8F - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 3:53:26 PM
Creation date
9/19/2013 10:58:41 AM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2013-025
Agency
PUBLIC WORKS
Council Approval Date
2/4/2013
Expiration Date
6/30/2014
Insurance Exp Date
7/1/2014
Destruction Year
2020
Notes
Amends A-2007-167, A-2008-139, -001, -002, -003, A-2012-074 Amended by A-2013-025-01
Document Relationships
PLACEWORKS FORMERLY KNOWN AS THE PLANNING CENTER 8g - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8B - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8C - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8D - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8E - 2012
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 10, 2012 <br />Page3 ' <br />TASK 14. PLANNING COMMISSION <br />Two hearings; revised to include attendance at one hearing. <br />TASK IS. CITY COUNCIL <br />Two hearings; revised to include attendance at one hearing. <br />TASK - <br />ORIGINAL PROPOSAL <br />AMENDMENT <br />Task 11. Project Meetings <br />5 Total <br />9 Total <br />1. Kick-off meeting <br />I. Kickoff meeting (,Ma(ch 1, 2009) <br />2. Team meeting <br />2. Team meeting (May 14, 2009) <br />3. Draft EIR review <br />3. Project Status Meeting (April 12, 2010) <br />4. Final EIR review <br />4. 2nd kick -off (October 5, 2011) <br />S. Planning Commission hearing <br />S. City Council hearing 7 workshop <br />preparation <br />(October 17, 2011) <br />6. Project Status Meeting <br />(November 29, 2011) <br />7. Project Team Meeting <br />(December 14, 2011) <br />B. Project Team kleeting Ganuary S. 2012) <br />Task 12. ETAC +RDA <br />2 <br />1 (but can be used for other meeting <br />requirement) <br />Task 13. Public Scoping Meating <br />1 <br />1 <br />Task 14. Planning Commission <br />2 <br />1 <br />Task IS: City Council <br />2 <br />1 <br />Total Meetings <br />12 <br />12 <br />TASK 16. NOISE & VIBRATION <br />Using the revised traffic study specifics, we will reassess the noise conditions for existing conditions (if changed <br />from 2009), as well as the future scenarios for the buildout year with and without the project The analysis will <br />include revisions to the assessment of future noise impacts for sensitive receptors that are currently in the second <br />and third row from the street, but will be adjacent to the roadway following the street widening. It is assumed <br />that the remainder of the previous noise technical report sections, such as the baseline survey, the construction <br />analyses, and the assessment of stationary sources, can be used in their entirety without updates or <br />modifications. <br />TASK 17. AIR QUALITY AND GREENHOUSE GAS EMISSIONS <br />The air quality modeling and analysis is currently based on the traffic analysis prepared by 181 Group in November <br />2009. The baseline and forecast year traffic volumes will be revised by 191 Group; therefore, revisions to the air <br />quality and greenhouse gas (GHG) emissions analysis will be required to ensure the environment document is <br />internally consistent. In addition, since 2009 the South Coast Air Quality Management District (SCAQMD) has <br />released a new air quality model for analyzing construction and operational impacts. Construction impacts were <br />previously analyzed using the URSEMIS2007 model and will be updated using SCAQMD's new CaIEEMod <br />program in accordance with SCAQMD guidance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.