Laserfiche WebLink
PROJECT SCOPING <br />Constraints Identification <br />IBI Group will work with The Planning Center and City of Santa Ana to identify constraints within the project limits that will <br />affect the feasibility and desirability of alternatives. Constraints will be researched to determine if they are "fatal flaw" items or <br />merely items of concern. <br />FIELD SURVEY /TOPO <br />VA Consulting wi l establish horizontal and vertical survey control for the site, set panels, and arrange for aerial and ground <br />survey of Warner Avenue between Blain Street and Grand Avenue. When on- ground panels and utility features have been <br />marked, the project area will be flown. The ground survey will include cross - sections at 100 -foot intervals. This field survey <br />will also collect coordinates for any visible surface culture within the defined limits (manholes, catch basins, overhead wires, <br />landscape, etc.) The aerial and ground survey data will be used to create topographic mapping, including surface features, <br />right -of -way data, assessor parcel numbers, and contours for design purposes. The final topographic mapping for the project <br />will be prepared on 24" x 36" sheets at a scale of I" = 40' with I -foot contours. <br />Deliverable: <br />• Survey field notes, electronic files, and a hard copy of the topographic mapping <br />PRELIMINARY ENGINEERING PLANS <br />Subsequent to the selection a preferred Build Alternative by the City, a draft set of preliminary street improvement plans) will <br />be prepared consistent with a 1506 level of design development. The plans will include; existing and proposed (if applicable) <br />street center lines; proposed curb lines, sidewalks, and parkway features; proposed driveway and curb return modifications; <br />proposed lane geometries; impacted surface and subsurface utility and drainage features; existing and proposed ROW; major <br />street callouts; and approximate locations, limits, and heights of proposed retaining walls. Layouts of all this information will <br />have a scale of 1 " =50' (22 "04 "). Separate streets will include proposed typical street sections. No profiles or elevation data will <br />be included in the plans and the attached fee proposal assumes profiles will not be required. <br />The proposed roadway modification alternatives selected for analysis will be reviewed for potential impacts to existing and <br />future utility facilities and possible mitigations to likely utility impacts. The results will be summarized for the various utility <br />alternatives and their cost, timing, and easement implications. All correspondence and meetings with the utility companies <br />throughout this project phase will be summarized and documented in the Preliminary Engineering Report. The Draft plan set <br />package will be submitted to City staff for review and comment. Comments will be logged and formal responses prepared and <br />submitted to the City for concurrence. The plans will be revised to address the comments and a final plan will be submitted to <br />The Planning Center and the City. <br />Deliverable: <br />• Preliminary Engineering Report <br />DRAFT ENGINEERING REPORT <br />All items produced in the task above will be compiled into a single document and submitted to City staff for review and <br />approval. The report will address civil roadway, traffic, access and safety, geotechnical, utilities /drainage, right of way, <br />environmental, landscaping, and capital costs. IBI will prepare an outline for City staff to review before completion of the <br />technical studies. <br />City of Santa Ana - Proposal to Prepare Environmental Documents for Warner Avenue Widening Project The Planning Center I Page 6 <br />