My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - MAIN LIBRARY ELEVATOR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/04/2013
>
23A - PROJ - MAIN LIBRARY ELEVATOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2013 10:22:44 AM
Creation date
10/31/2013 3:39:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
11/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />REQUEST FOR PROPOSAL (RFP) <br />FOR <br />SANTA ANA MAIN LIBRARY ELEVATOR MODERNIZATION <br />RFP NO. 13 -038 <br />INTRODUCTION / PROJECT DESCRIPTION <br />The City of Santa Ana is seeking a qualified Contractor to provide design and construction services <br />to modernize the existing hydraulic elevator at the Santa Ana Public Library. <br />Modernization is necessary to improve reliability of the elevator and its equipment, minimize <br />shutdowns, ensure the safety of the building tenants, reduce the risk of injury to passengers, and <br />increase tenant satisfaction. <br />Existing capacity is 1,200 lbs., speed is 100fpm and service to three (3) floors <br />II. SCOPE OF WORK <br />A. OVERVIEW <br />In general, the works consists of providing new power unit and controller, new fixtures and door <br />improvements as described herein. The Contractor shall be responsible for the following items <br />during the design development and construction phases of the project: <br />• Providing general administration of the Agreement with the City of Santa Ana. <br />• Interpreting the requirements of this RFP. <br />• Managing and supervising design and construction professionals. <br />• Developing the design for the project within budgetary and schedule commitments. <br />• Preparing necessary construction plans and /or shop drawings. <br />• Processing entitlements related to design responsibilities such as building plan -check <br />approvals. <br />• Ensuring regulatory and code compliance. <br />• Preparing estimates of probable construction costs. <br />• Obtaining entitlements related to construction such as building permits. <br />• Maintaining the construction schedule. <br />• Job site safety. <br />• Providing methods and means of construction. <br />• Fulfilling the requirements of the construction documents. <br />• Guaranteeing the quality of the construction. <br />• Correcting any deficiencies covered by the guarantee. <br />B. DESIGN DEVELOPMENT <br />The Contractor is responsible for and shall provide necessary detailed plans and /or shop drawings, <br />City of Santa Ana RFP 13 -038 <br />Page s Exhibit A —1 <br />23A -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.