My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - MAIN LIBRARY ELEVATOR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/04/2013
>
23A - PROJ - MAIN LIBRARY ELEVATOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2013 10:22:44 AM
Creation date
10/31/2013 3:39:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
11/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Sal Tinaf ero <br />COLINCILMEMBERS <br />Angelica Amazma <br />P. David Bensvides <br />Michele C. Martinez <br />Roman A. Rayne <br />Vincent F. Sannlento <br />September 12, 2013 <br />ADDENDUM TWO <br />CITY OF SANTA ANA <br />Public Works Agencv <br />20 Civic Center Plaza • RO. Box 1988, M -21 <br />Santa Ana, California 92702 <br />SUBJECT: REQUEST FOR PROPOSAL. #13 -038: <br />Santa Ana Main library Elevator Modernization <br />The following revisions have been made to the above Request for Proposal (RFP); <br />INTERIM CITY MANAGER <br />Kevin O'Rourke <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D. Hulzar <br />Notice Inviting Proposals: Revise the second sentence of the first paragraph to read as follows: <br />Responses to the Request for Proposals (RFP) will be accepted until Monday September 23, 2013 at 4:00 p.m. <br />Section C. e-: Guarantee: Revise the section to read as follows: <br />Contractor shall provide a one -year guarantee on materials and workmanship, and one -year warranty on parts as <br />implemented per this RFP. Contractor shall provide regular service and maintenance during this one -year period, <br />per manufacturer's recommendations, and shall provide schedule outlining preventative maintenance items and <br />frequency as part of proposal. <br />Alternate Bid #1: Cab Interior: Add the following items: <br />+ Dismantle completely interior ceiling, wells and flooring of existing elevator to cab wall shell. <br />Install new "SNAP Cab ", or approved equal, on cab front, back and sidewalts. Panels shalt be vertical style. <br />+ Verify ADA compliance of existing handrail. Adjust or replace as necessary. <br />+ Install new economy style ceiling with LED can - lights. <br />• Remove existing flooring and install new flooring by "American Floor Mats ; or approved equal. Color to be <br />determined. <br />• New interior components shall not increase cab weight by an amount more than 5% of current weight. <br />• Existing bronze sill plates and manufacturer plaque shall be protected in place. <br />Appendix B: Proposer's Certification and Proposal Item Pricing: Replace the existing sheet with the new form <br />as attached <br />All other terms and conditions of the RFP remain unchanged. <br />If you should have any questions regarding this project, please contact me at (714) 571 -4241. <br />Sincerely, <br />SFI,wix i.t, <br />Suzl Furjanic, AIA, LEED Green Associate <br />Assoc. P/L Planner <br />City of Santa Ana <br />Public Works Agency <br />23A -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.