My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - 4226-4306 W FIFTH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/04/2013
>
75C - PH - 4226-4306 W FIFTH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2013 12:14:00 PM
Creation date
11/1/2013 12:06:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
11/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q: Where does the "street water" go? <br />A: We do not have the civil plans yet. <br />Q: Issues with street flooding when it rains. Water comes from Harbor down 5`h to Newland. There is <br />only one catch basin in the area. There have been broken pipes in the area. <br />A: The project will contribute less water to this issue because there will be less paved area <br />Q: Will there be fire hydrants? <br />A: As required by the fire department. <br />Q: What is the zoning? <br />A: Currently agriculture. Proposal is to change to "Specific Development ". <br />Q: What is the minimum lot size? <br />A: The "Specific Development' designation does not have a minimum lot standard. The density is <br />designated by the General Plan (Medium Density). However, the lots will range from 3,500 to 4,000 <br />square feet. <br />Q: Will the homes be single family? <br />A: The homes are single family detached. However, the project is a 1 -lot subdivision with a condo map. <br />This is a typical arrangement for infill projects in Orange County. <br />Q: Is there 5 feet of separate between buildings? <br />A: Yes. <br />Q: Will the materials to be used in the construction of the project be purchased from businesses in the <br />City of Santa Ana. <br />A: There is no requirement for that. Project will be bid out to multiple subs. <br />Q: Is Harbor to the east of the project? <br />A: Yes. <br />Q: Will there be a pool? <br />A: No. <br />
The URL can be used to link to this page
Your browser does not support the video tag.