Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br />5 Santiago Street , Lofts <br />CA <br />Santa Ana, CA <br />Page 3 <br />Completlon <br />Timing of <br />Method of <br />Responsibility for <br />MM No. <br />Mitigation Measure <br />Verification <br />Verification <br />Monitoring <br />Compliance <br />Date <br />Initials <br />flatwork, and pavement, shall be <br />Permit <br />designed in accordance with the <br />recommendations specified in the <br />Preliminary Geotechnical Investigation <br />prepared by Albus -Keefe & <br />Associates, Inc., (July 23, 2003). <br />Hazards <br />and Hazardous Materials <br />Prior to the issuance of demolition <br />permits, an asbestos survey (i.e., <br />Prior to <br />VII -1 <br />inspection, identification, and <br />Issuance of <br />Plan Check <br />Environmental <br />quantification) shall be prepared and <br />Demolition <br />Coordinator <br />submitted to the City of Santa Ana <br />Permit <br />Environmental Coordinator for review. <br />SCAQMD notification to include <br />project description, removal <br />Prior to <br />VII -2 <br />procedures and time schedules <br />Issuance of <br />Plan Check <br />Environmental <br />(options provided in Rule), material <br />Demolition <br />Coordinator <br />handling and clean -up, material <br />Permit <br />storage and disposal methods. <br />All handling and removal of ACM must <br />be performed by a certified California <br />State licensed contractor that has <br />been certified under the California <br />Occupational Safety and Health <br />During <br />On -Site <br />Demolition <br />VII -3 <br />Administration (Cal OSHA). All <br />Demolition <br />Monitoring <br />Contractor <br />workers must undergo 40 hours of <br />hazardous materials handling training <br />and receive 8 hours of refresher <br />training on a yearly basis. <br />When necessary, actual asbestos <br />removal would be accomplished under <br />a negative pressure environment with <br />high efficiency particulate air (HEPA) <br />filtration, through the use of a glove <br />During <br />On -Site <br />Demolition <br />VII -4 <br />bag or through adequate wetting. <br />Demolition <br />Monitoring <br />Contractor <br />ACM is to be contained in certified <br />leak -proof containers and the general <br />public is not allowed access to the <br />demolition -site. <br />H drolog and Water Quality <br />The project developer shall prepare <br />an NPDES post- construction storm <br />!, <br />water management plan In <br />accordance with the Orange County <br />Drainage Area Management Plan <br />(DAMP) that Includes all structural <br />and non - structural "Best Management <br />Practices" (BMPs) for the project. <br />a. Submit and have approved a <br />Prior to <br />Issuance of <br />Building and <br />VIII.1 <br />surface drainage /utility plan that <br />Grading <br />Plan Check <br />Planning Agency <br />includes all structure BMPs (refer <br />Permit <br />to DAMP). <br />b. Provide two copies of the "Water <br />Quality Management Plan" <br />(WQMP) that includes a <br />description of all applicable <br />structural and non - structural <br />BMPs that may apply to the <br />proposed project. <br />Mitigation Monitoring and Reporting Program <br />5 Santiago Street , Lofts <br />CA <br />Santa Ana, CA <br />Page 3 <br />