Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br />Santiago Street Lofts <br />Santa Ana, CA <br />51 Page 2 <br />Completion <br />Timing of <br />Method of <br />Responsibility for <br />MM No. <br />Mitigation Measure <br />Verification <br />Verification <br />Monitoring <br />Compliance <br />Date <br />Initials <br />Streets surrounding the project <br />site shall be cleaned at the end <br />of each day of construction. <br />All material transported off -site <br />shall either be sufficiently <br />watered or securely covered to <br />prevent excessive amounts of <br />dust. <br />Cultural Resources <br />Grading plans for the proposed project <br />shall reflect the following note: "In the <br />event unknown cultural resources are <br />Prior to <br />encountered during excavation and <br />Issuance of <br />Building and <br />V -1 <br />grading operations, all grading and <br />Grading <br />Plan Check <br />Planning Agency <br />excavation shall cease in the area of <br />Permit <br />the find and the City's Environmental <br />Coordinator shall be notified for <br />appropriate action." <br />Geologya nd Soils <br />All earthwork and grading shall be <br />Prior to <br />performed in accordance with all <br />Issuance of <br />Building and <br />VI -1 <br />applicable requirements of CALOSHA <br />Grading <br />Plan Check <br />Planning Agency <br />and applicable specifications of the <br />Permit <br />Santa Ana Grading Code. <br />All earthwork recommendations <br />specified in the Preliminary <br />Geotechnical Investigation prepared <br />by Albus -Keefe & Associates, Inc., <br />Prior to <br />(July 23, 2003), including those for <br />Issuance of <br />Building and <br />VI -2 <br />site clearance, ground preparation, <br />Grading <br />Plan Check <br />Planning Agency <br />temporary excavations, placement of <br />Permit <br />fill, and potential importation of soil <br />materials to the site, shall be <br />incorporated into the design of the <br />proposed project. <br />The site and structures shall be <br />designed in accordance with the <br />following values prescribed in the <br />1997 Uniform Building Code, which <br />include: <br />Parameter <br />Value <br />Seismic Zone Factor, Z <br />Prior to <br />Issuance of <br />Building and <br />VI -3 <br />0.4 <br />Grading <br />Plan Check <br />Planning Agency <br />Soil Profile Type, S <br />Permit <br />Sc <br />Near Source Factor, Na <br />1.0 <br />Near Source Factor, Nv <br />1.0 <br />Seismic Coefficient, Ca <br />0.44 <br />Seismic Coefficient, Cv <br />0.64 <br />The project elements, including <br />Prior to <br />Building and <br />VI -4 <br />foundations, masonry retaining walls, <br />Issuance of <br />Plan Check <br />Planning Agency <br />cement type, exterior slabs and <br />Grading <br />Mitigation Monitoring and Reporting Program <br />Santiago Street Lofts <br />Santa Ana, CA <br />51 Page 2 <br />