My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
041904 Jt PH Permit Zoning DDA Santiago St Lofts Develop
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2000-2009
>
2004
>
04/19/04
>
041904 Jt PH Permit Zoning DDA Santiago St Lofts Develop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2013 8:42:57 AM
Creation date
11/5/2013 8:41:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />Santiago Street Lofts <br />Completion <br />Page 5 <br />Timing of <br />Method of <br />Responsibility for <br />MM No. <br />Mitigation Measure <br />Verification <br />Verification <br />Monitoring <br />Date <br />Initials <br />Compliance <br />Transmission Class (STC) and Impact <br />Insulation Class IIC re uirements. <br />Public Facilities <br />Prior to the issuance of building <br />permits, the project developer shall <br />Prior to <br />submit evidence to the City of Santa <br />Issuance of <br />Building and <br />XIII -1 <br />Ana of a fee payment between the <br />Building <br />Receipt <br />Planning Agency <br />developer and Santa Ana Unified <br />Permit <br />School District to offset school facility - <br />related impacts. <br />Prior to the issuance of certificate of <br />Prior to <br />occupancy permits, the project <br />Issuance of <br />Building and <br />XIII -2 <br />developer shall be subject to the <br />Building <br />Plan Check <br />Planning Agency <br />provisions of Chapter 34 Article B of <br />Permit <br />the Santa Ana Munici al Code. <br />Transportation and Traffic <br />The applicant shall be required to pay <br />a "fair share" contribution towards the <br />required improvements (i.e., traffic <br />signals) at the following intersections: <br />Lacy Street/Santa Ana Boulevard, <br />Poinsettia StreetJSanta Ana <br />Prior to <br />Boulevard, and Santiago Sires Civic <br />Issuance of <br />Building and <br />XV -1 <br />Center Drive. The "fair share' <br />Building <br />Plan Check <br />Planning Agency <br />contributions shall be based on the <br />Permit <br />percentage of project - related traffic <br />compared to the total traffic volume. <br />The "fair share' contributions shall be <br />paid to the City prior to issuance of <br />the building permits for the proposed <br />olect. <br />Prior to approval of grading plans, <br />Prior to <br />project access points shall be <br />Approval of <br />Building and <br />XV -2 <br />reviewed for consistency with Caltrans <br />Grading <br />Plan Check <br />Planning Agency <br />and City of Santa Ana sight distance <br />Plans <br />standards. <br />Mitigation Monitoring and Reporting Program <br />Santiago Street Lofts <br />Santa Ana, CA <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.