Laserfiche WebLink
Biological Resources <br />The Proposed Project will not result in any new or changed impacts to biological resources <br />compared to the approved Project. The project site is developed and there are no native biological <br />resources on the property. The vegetation that exists on the site includes introduced non -native <br />urban plant species and will not be impacted by its removal to construct the Proposed Project. As <br />with the approved Project, the Proposed Project will not have any biological resource impacts. The <br />Proposed Project is consistent with the analysis in the March 19, 2007 EIR. <br />Cultural Resonn -es <br />The Proposed Project will not result in any new or changed impacts to cultural or paleontological <br />resources compared to the approved Project. The project site is developed and there are no known <br />cultural or paleontological resources on the property. Mitigation measures associated with the <br />approved Project are in place to protect any cultural or paleontological resources that may be <br />uncovered during project construction. The Proposed Project will not have any cultural resource <br />impacts. The Proposed Project is consistent with the analysis in the March 19, 2007 EIR. <br />Geology vud Soils <br />The Proposed Project would not result in any ne%v or increased geology or soil impacts compared to <br />the approved Project. Like the approved Project, the Proposed Project would be exposed to <br />potential liquefaction. And like the Project, the incorporation of the same applicable mitigation <br />measures to mitigate potential seismic event, liquefaction and soil erosion impacts will be applicable <br />to the Proposed Project. The Proposed Project will not have any new or added geological and soils <br />impacts compared to the approved Project. The Proposed Project is consistent with the analysis <br />and mitigation measures in the March 19, 2007 FIR. <br />Grreuboase Gas Embsious <br />Because a greenhouse gas emission analysis was not required by CEQA at the time of the approval <br />of the Project, a greenhouse gas analysis was conducted for the Proposed Project. A copy of the <br />greenhouse gas analysis is attached as Appendix B. Based on the greenhouse gas analysis, the <br />Proposed Project will not have any significant greenhouse gas impacts and no mitigation measures <br />are recommended. <br />Hazards and 1 faZardms r14aieriols <br />The Proposed Project will not result in any significant hazards or hazardous material impacts. The <br />potential hazards and hazardous materials of the approved Project will be the same for the Proposed <br />Project. The Proposed Project will not result in any new or increased hazards compared to those <br />identifled with the Project. The Proposed Project is consistent with the analysis and mitigation <br />measures in the March 19, 2007 MR. <br />1901 East Rust Street — Addendum Page 7 <br />Aubmst 14, 2013 <br />