My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - 2ND READ ORDINANCE - BUILDING CODES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
11A - 2ND READ ORDINANCE - BUILDING CODES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 6:59:20 AM
Creation date
11/15/2013 6:53:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
11A
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hazard due to the presence of combustible vegetation, or the proximity of the <br />property to an area that contains combustible vegetation. <br />HIGH -RISE BUILDING. In other than Group 1 -2 occupancies, "high -rise <br />buildings" as used in this Code: <br />Existing high -rise structure. A high -rise structure, the construction of which <br />is commenced or completed prior to July 1, 1974. <br />High -rise structure. Every building of any type of construction or occupancy <br />having floors used for human occupancy located more than 75 55 feet above <br />the lowest floor level having building access ' 103 except <br />buildings used as hospitals as defined in Health and Safety Code Section <br />1250. <br />New high -rise building. A high -rise structure, the construction of which is <br />commenced on or after July 1, 1974. For the purpose of this section, <br />construction shall be deemed to have commenced when plans and <br />specifications are more than 50 percent complete and have been presented <br />to the local jurisdiction prior to July 1, 1974. Unless all provisions of this <br />section have been met, the construction of such buildings shall commence on <br />or before January 1, 1976. <br />New high -rise structure. means a high -rise structure, the construction of <br />which commenced on or after July 1, 1974. <br />SAFETY AREA. A defined area surrounding the landing pad that is free of <br />obstructions. <br />TAKEOFF AND LANDING AREA. The combination of the landing pad centered <br />within the surrounding safety area. <br />SECTION 48: That section 14 -22 of the Santa Ana Municipal Code is hereby amended <br />such that it reads as follows: <br />Sec. 14 -22. General Requirements (Chapter 3). <br />(a) Section 304.1.2 (7) Vegetation is hereby amended as follows: <br />Weeds, grass, vines or other growth that is capable of being ignited and <br />endangering property, shall be cut down and removed by the owner or occupant <br />of the premises. Vegetation clearance requirement in urban - wildland interface <br />areas shall be in accordance with Chapter 49 and OCFA vegetation <br />management guidelines. <br />(b) Section 305.5 Chimney spark arresters is hereby added as follows: <br />Ordinance No, NS -XXXX <br />11 A -39 Page 37 of 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.