My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP INTEGRATED SOFTWARE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
19C - RFP INTEGRATED SOFTWARE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 7:31:12 AM
Creation date
11/15/2013 7:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
19C
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAPD Integrated Law Enforcement Solution RFP <br />Chapter 3: Functional Response <br />C <br />Future Version: Requirement will be met by <br />3 <br />C <br />software that is currently under development or in <br />4 <br />Beta test. Vendors must agree to have the <br />developmental functionality in productive use in <br />another client site for at least six (6) months prior <br />to installing the product in the SAPD environment. <br />I <br />All requirements marked by this code must be <br />2 <br />provided to SAPD no later than the beginning of <br />the Functional Test period for the product. <br />D <br />Third Party: Requirement will be met by the use <br />2 <br />of proposed software tools, such as a report writer, <br />R <br />query language or spreadsheet. <br />1 <br />E <br />Customization: Requirement will be met by major <br />1 <br />modifications to existing software or by new <br />custom software programming. <br />F <br />Not Available: Requirement cannot, and will not, <br />0 <br />be provided. <br />Rank <br />SAPD Prioritization of Requirements Legend <br />Weight of <br />Importance <br />C <br />Critical (Designated by the red box, with the letter <br />4 <br />'C' next to the requirement): This requirement is <br />critical to the Department, and the vendor's <br />response to this requirement will be multiplied by a <br />factor of four (4). <br />I <br />Important (Designated by the orange box, with <br />2 <br />the letter T next to the requirement): This <br />requirement is important to the Department, and <br />the vendor's response to this requirement will be <br />multiplied by a factor of two (2). <br />R <br />Routine (Designated by the yellow box, with the <br />1 <br />letter 'R' next to the requirement): This requirement <br />is considered to be a routine requirement to the <br />Department, and the vendor's response to this <br />requirement will be multiplied by a factor of one <br />M. <br />19C -59 3 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.