My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR BRISTOL ST WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/02/2013
>
55B - RESO - EIR BRISTOL ST WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:49:34 AM
Creation date
12/2/2013 9:57:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
12/2/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17'� Street <br />impacts of the approved Project but that are not adopted. The proposed modifications do not identify or <br />require adoption of any further mitigation measures or alternatives beyond those provided in the certified <br />1990 FEIS /EIR for the approved Project, since additional mitigation measures are either not necessary or <br />not feasible, and the alternatives analyzed in the 1990 FEIS /EIR represent a reasonable range as required <br />pursuant to CEQA (see CEQA Guidelines Section 15162(a)(3)). <br />This Addendum relies on the certified 1990 FEIS /EIR and the related administrative record, in addition to <br />the additional documentation included to support the Addendum, including the appendices. The <br />Addendum is to be included or attached to the 1990 FEIS /EIR and is not to be considered as an <br />independent or separate document. <br />As this Addendum does not identify new or substantially greater significant impacts, circulation for <br />public review and comment is not necessary pursuant to CEQA Guidelines Section 15164(c). However, <br />the City Council will consider and adopt or reject this Addendum at a public meeting (refer to CEQA <br />Guidelines Section 15164(d)). The findings of the City Council in its resolution of adoption of this <br />Addendum, if adopted, will reflect this Addendum which provides the basis and substantial evidence for <br />the decision not to prepare a Subsequent or Supplemental EIR (refer to CEQA Guidelines Section <br />15164(e)). <br />1.2 Project Location <br />The proposed Project includes a segment of Bristol Street between Washington Avenue and 176' Street in <br />the City of Santa Ana. The City of Santa Ana, located within the County of Orange, is surrounded by the <br />Cities of Tustin, Orange, Costa Mesa, Fountain Valley, and Garden Grove. The proposed Project site is <br />located approximately 1.5 miles north of the San Diego Freeway (I -405) and approximately three miles <br />south of State Route 22 (SR -22). Refer to Figures 1 and 2 for the regional map and Project location map <br />with proposed roadway alignment and widening. <br />1.2.1 Existing Land Uses <br />The Project area and surrounding vicinity is located within an urbanized area of the City of Santa Ana. <br />Existing land use along the Project corridor consists of commercial and institutional development, and <br />single - family residences. Santa Ana College comprises land use on the west side of Bristol Street, <br />whereas single - family residences are only located on the east side of Bristol Street within the Project <br />limits. The existing single - family residences consist of single -story homes, and include outdoor areas of <br />frequent human use (i.e., rear and side yards). Figure 3 (Existing Land Use [1990 FEIS /EIR]), illustrates <br />existing land use as identified in the 1990 FEIS /EIR. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE 4 <br />55B -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.