Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase HIS — Washington Avenue to 17' Street <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />e.) Create or contribute runoff water which would exceed the capacity of existing or planned storm <br />water drainage systems or provide substantial additional sources ofpolluted runoff? <br />Refer to response in 3.9 (c.), above. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />f.) Otherwise substantially degrade water quality? <br />Refer to response in 3.9 (c.), above. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />g.) Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard <br />Boundary or Flood Insurance Rate Map or other flood hazard delineation map? <br />The proposed widening would not place any housing within a 100 -year flooding zone as mapped by the <br />Federal Emergency Management Agency; therefore, no impact would result from the proposed Project in <br />that regard. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />h.) Place within a 100 year flood hazard area structures which would impede or redirect flood <br />flows? <br />Refer to response in 3.9 (g.), above. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />L) Expose people or structures to a significant risk of loss, injury or death involving flooding, <br />including flooding as a result of the failure of a levee or dam? <br />ANA 111-334 (PER- 02 -01) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE 40 <br />55B -47 <br />