Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to I7`" Street <br />The proposed Project does not involve the development or placement of any structures, with exception of <br />relocation of utility poles. Therefore, the Project would not expose people or structures to a significant <br />flooding risk beyond that which already exists. No impact would result from the proposed Project. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />j.) Inundation by seiche, tsunami, or mudflow? <br />The Project site is located approximately 10 miles inland from the Pacific Ocean; therefore, the likelihood <br />of tsunami impacting the site is minimal. The Project site and vicinity are highly urbanized and there is no <br />unusual slope or geologic features in the area. The potential for seiche, tsunami, or mudflow impacting <br />the Project site is less than significant. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measure <br />No new additional mitigation measures are required. <br />3.10 Land Use and Planning <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsection A - Landform Modification, of the 1990 FEIS /EIR. <br />a.) Physically divide an established community? <br />The proposed Project involves the widening of Bristol Street between Washington Avenue and 171, <br />Street; the proposed widening would not divide an established community. Although the proposed <br />widening of Bristol Street within the Project limits would result in full acquisition of existing properties, <br />the Project would not create a physical barrier to, or separate a community. The proposed Project would <br />not introduce any significant land use impacts than previously analyzed. No significant impact would <br />result from the Project implementation. Impacts would be similar to those identified in the 1990 <br />FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />b.) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction <br />over the project (including, but not limited to the general plan, specific plan, local coastal <br />program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an <br />environmental effect? <br />According to the City of Santa Ana's General Plan, the Project area is designated General Commercial <br />(GC). The zoning designation of properties within the Project area is Specific Plan (SPI) which allows for <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA 01/25/2013 REV2) 132897 CM PAGE 41 <br />55B -48 <br />